Supporting Documentation · May 28, 2026
Traffic Impact Study 07 21 2025 submission
b1a9a72df7c7de2c8b92b634347f763b42defbf6280a560147a1346b88638e58Indexed text · page 56
Show all pages1956 24-04212 Build-PM 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR v/c Ratio 0.67 0.43 0.15 0.39 0.22 0.33 0.27 Control Delay (s/veh) 36.8 2.0 38.3 9.9 9.1 16.7 5.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 36.8 2.0 38.3 9.9 9.1 16.7 5.3 LOS D A D A A B A Approach Delay (s/veh) 18.2 38.3 9.3 12.5 Approach LOS B D A B Queue Length 50th (ft) 98 0 9 29 37 64 25 Queue Length 95th (ft) 196 0 35 119 119 165 96 Internal Link Dist (ft) 197 145 245 14 Turn Bay Length (ft) 100 Base Capacity (vph) 651 675 181 658 2227 1587 1131 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.39 0.43 0.12 0.37 0.22 0.33 0.27 Intersection Summary Area Type:
0 0 Reduced v/c Ratio 0.39 0.43 0.12 0.37 0.22 0.33 0.27 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 73.5 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.67 Intersection Signal Delay (s/veh): 13.1 Intersection LOS: B Intersection Capacity Utilization 64.1% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway DJR Synchro 12 Report 07/21/2025 Lanes, Volumes, Timings
File revisions (1)
- Sep 29, 2026
b1a9a72df7c75,930,232 bytes