Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 28, 2026

Completed Prelim and Final Site Plan Checklist submission

Preserved file SHA-256c9799abf95dcc9834eeda1349f41635c9c3a2b9ad4390c030ac678af861f5713

Indexed text · page 3

Show all pages
Page 3

ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY LICENSED PROFESSIONAL. Item Number Description Pre-Application ~ Concept Plan Major Application Minor Application Subdivision Site Plan General Development Plan Subdivi Site Plan Preliminary Final | Preliminary Final ALaIdNOD ALITd WOON gaisanogu AAIVAN 23, em: List of required regulatory approvals or permits. Con ment: Basie planning information, ¢ Item: List of variances required or requested. Comment: Basic planning information, 25, lem: Requested or obtained d exceptions, ¢ Comment: Describes location of all adjacent structures; not necessary at pre-application-concept plan stages; required at site plan stages; required at site plan only if notice is required by ordinance. ign waivers or 26, lem: Payment of application fees, Comment: Fee not imposed for pre-application conference, 27. Item: Property owners and lines of all parcels within 200° identified on most recent tax map sheet, Comment: Describes location of all adjacent structures; not necessary at pre-application-concept plan stages; required at site plan only if notice is required by ordinance, C 1S] SIGS 28, Nem: All exis plains, wetlands or other envi ‘areas on and within 200' of site Comment: while detailed specification of environmentally sensitive areas may not be necessary al pre-application-concept plan and GDP slages, general specification of and sensitivity 10 such conditions is an important planning consideration, ig street, water courses, flood mentally sensitive < 29, Item: Existing right-of-way and/or easements on and within 200' of tract. Comment: Rights-of-way and easements are often unknown at the pre-application-concept (see however, item 28). 30, Item: Topographical Features of subject property from U.S.G.S. map. ‘Comment: More detailed topographic information is needed for major subdivision N/A N/A

File revisions (1)