2.1.3 Aesthetic Maintenance Procedures: a) Graffiti Removal: The timely removal of graffiti will restore the aesthetic quality of the pervious pavement system. Removal can be accomplished by paint or other cover, or removal with scrapers, solvents or cleansers. Timely removal is important to discourage further graffiti and other acts of vandalism. b) Grass Trimming/Landscape Maintenance: The lawn areas around the pervious pavement system shall be mowed on a regular basis as necessary to maintain the lawn at a height of 2 to 3-inches. These areas shall also be fertilized twice a year, once in the spring and once in the fall. Fertilizer for lawn areas shall be 10-20-10 applied at a rate of 11 lbs. per 1,000 sf. or as determined by a soil test. Any bare, dead or damaged lawn areas shall be re-seeded in accordance with the original procedures as outlined in the Soil Erosion and Sediment Control Plans using the same mix and seeding rates. Stabilization of bare or damaged areas shall be done in a timely fashion so as to avoid exposing the soil to erosion. If season prevents the re-establishment of turf cover, exposed areas should be stabilized with straw or salt hay mulch as described in the Soil Erosion and Sediment Control Plans until permanent seeding can be done. Seeding can be done between March 15th and June 15th and between September 15th and December 1st, only if adequate water is provided. The shrubs around the pervious pavement system should also be maintained in order to promote a neat appearance and healthy, vigorous growth. All shrubs should be allowed to grow together in masses as shown on the plans and not pruned into individual plants. The planting beds should be mulched with hardwood mulch every two (2) years in order to provide a suitable growing medium for the shrubbery and to retain moisture around the root zones. Pruning of shrubs should also be done on a regular basis to maintain the shape and appearance of the shrub masses. The height of the shrubs may vary according to the plants natural growth habits, but should not exceed 6-feet. Pruning should be done as necessary throughout the year to remove dead branches and to control new growth. Any pruning, other than the removal of dead branches, should be done in either late winter/early spring or after the shrub has flowered in the spring. In the event that a shrub should experience more
Any pruning, other than the removal of dead branches, should be done in either late winter/early spring or after the shrub has flowered in the spring. In the event that a shrub should experience more than 2/3 die back, it should be replaced in kind as soon as possible in either the spring or fall planting season. The replacement shrub should be the same species as the original and installed at the size and condition as specified on the original landscape plans. If, for any reason, a substitution of species or size must be made, it shall be subject to the approval of the project Landscape Architect. 8
The trees surrounding the pervious pavement system area shall be maintained regularly to ensure good health and exhibit an attractive appearance. Their maintenance should include fertilization twice annually, with one application in the spring and another in early fall. The trees shall be pruned in the late winter or early spring. However, dead branches should be removed as soon as they are noticed. Care should be taken to avoid cutting off the central leader of a tree if one is present. If a tree is severely damaged or experiences more than 2/3 die back, it should be replaced in either the spring or fall planting season, whichever comes first. The only exception to this is if the replacement tree has a fall transplanting hazard. Replacement trees should be planted at the same size and condition as specified on the landscape plans. Any tree or shrub maintenance, tree pruning or plant material substitution of species or size shall be subject to the approval of the project Landscape Architect. c) Control of Weeds: Although a regular grass maintenance program will minimize weed intrusion, some weeds will appear. Periodic weeding, either chemically or mechanically, will help to maintain a healthy turf, and keep grassed areas looking attractive. Application of chemicals should be minimized and monitored closely so as not to affect the ecosystems within the pervious pavement system. Excessive growth of weeds within the system can be controlled mechanically as discussed in the previous section. The recording of all maintenance work and inspections provide valuable data on the facility’s condition. Review of this information will also help to establish more efficient and beneficial maintenance procedures and practices. As the owner is ultimately responsible for site maintenance, all recorded information should be directed to the owner of the pervious pavement system for review and subsequent follow-up on recommendations. Data obtained from informal inspections should be retained; however, under current regulations, this data does not have to be submitted to NJDEP. 9
2.1.4 Summary of Maintenance Procedures: Preventative Maintenance a) Weed Growth b) Maintenance of Adjacent Areas c) Removal and Disposal of Trash/Debris and Sediment d) Elimination of Potential Mosquito Breeding Habitats e) Specific Maintenance of Underground Detention Basin Pipes & Chambers f) Parking Lot Maintenance Corrective Maintenance a) Removal of Debris and Sediment b) Structural Repairs c) Weed Harvesting d) Extermination of Mosquitoes e) Snow and Ice Removal Aesthetic Maintenance a) Graffiti Removal b) Grass Trimming/Landscape Maintenance c) Control of Weeds 2.1.5 Maintenance Equipment and Materials Note: Only light equipment is allowed to be used within open basins to prevent compaction. Grass Maintenance Equipment a) Riding Mowers b) Hand Mowers c) Gas Powered Trimmers d) Gas Powered Edgers e) Seed Spreaders f) Fertilizer Spreaders g) De-Thatching Equipment h) Pesticide and Herbicide Application Equipment i) Grass Clipping and Leaf Collection Equipment Vegetative Maintenance Equipment a) Saws b) Pruning Shears c) Hedge Trimmers d) Aquatic Weed Harvester (owned/operated by subcontractor) Transportation Equipment 10
Debris, Trash and Sediment Removal Equipment a) Loader (not to be used in the bottom of basins) b) Backhoe (not to be used in the bottom of the basins) c) Grader (not to be used in the bottom of the basins) d) Dredging Equipment (not to be used in the bottom of the basins) e) Portable Pump for Dewatering f) Jet Vac Equipment for removal of sediment in underground pipe & chamber basins Miscellaneous Equipment a) Shovels b) Wheel Barrows c) Gloves d) Hand Pushed Tilling Machine e) Brooms Standard Mechanics Tools Tools for Maintenance of Equipment Materials a) b) c) d) e) f) g) h) Topsoil Fill Seed Soil Amenities (Fertilizer, Lime, etc.) Chemicals (Pesticides, Herbicides, etc.) Mulch Paint Removers Spare Parts for Equipment Parking Maintenance Equipment a) Sweeping/Vacuuming Equipment b) Trash Receptacles c) Snow Plowing Equipment d) Snow Shovels 2.1.6 Checklists and Logs Appendix of this report contains sample checklists and logs regarding various aspects of the basin maintenance and inspection. A brief description of the use of each form is listed below: 1. “Maintenance Work Order and Checklist” – a comprehensive form outlining both required and completed maintenance work. 2. “Maintenance Log” – a summary table for recording of all maintenance work at the site. 3. “Inspection Log” – a summary table for recording the results of all inspections of the basins. G:\2023\NJA230139.00\Admin\Reports\O&M Manual\ Operations & Maintenance Manual - August 2025.doc 11
APPENDIX
MAINTENANCE WORK ORDER & CHECKLIST FOR STORMWATER MANAGEMENT FACILITIES
MAINTENANCE WORK ORDER AND CHECKLIST FOR STORMWATER MANAGEMENT FACILITIES NAME OF FACILITY LOCATION CREW EQUIPMENT WEATHER DATE WORK STARTED WORK COMPLETED TOTAL MANPOWER OF WORK A. PREVENTATIVE MAINTENANCE WORK ITEMS 1. GRASS CUTTING A. BOTTOMS B. EMBANKMENTS AND SIDE SLOPES C. PERIMETER AREAS D. ACCESS AREAS AND ROADS E. OTHERS 2. GRASS MAINTENANCE A. FERTILIZING B. RE-SEEDING C. DE-THATCHING D. PEST CONTROL E. OTHERS 3. VEGETATIVE COVER A. FERTILIZING B. PRUNING C. PEST CONTROL D. OTHERS 4. TRASH AND DEBRIS REMOVAL A. BOTTOMS B. EMBANKMENTS AND SIDE SLOPES C. PERIMETER AREAS D. ACCESS AREAS AND ROADS E. INLETS F. OUTLETS AND TRASH RACKS G. OTHERS 5. SEDIMENT REMOVAL A. INLETS B. OUTLETS AND TRASH RACKS C. BOTTOM D. OTHERS 6. ELIMINATION OF POTENTIAL MOSQUITO BREEDING HABITATS 7. UNDERGROUND BASIN MAINTENANCE A. BOTTOMS B. OUTLETS AND TRASH RACKS C. ACCESS HATCHES D. OTHERS 8. INFILTRATION BASIN - TILING BOTTOM SAND LAYER 9. OTHER PREVENTIVE MAINTENANCE A. PARKING LOT SWEEPING B. EMPTYING TRASH RECEPTACLES ITEMS REQUIRED ITEMS DONE COMMENTS AND SPECIAL INSTRUCTIONS
MAINTENANCE WORK ORDER AND CHECKLIST FOR STORMWATER MANAGEMENT FACILITIES NAME OF FACILITY LOCATION CREW EQUIPMENT WEATHER DATE WORK STARTED WORK COMPLETED TOTAL MANPOWER OF WORK B. CORRECTIVE MAINTENANCE WORK ITEMS ITEMS REQUIRED ITEMS DONE COMMENTS AND SPECIAL INSTRUCTIONS 1. REMOVAL OF DEBRIS AND SEDIMENT 2. STRUCTURAL REPAIRS 3. EMBANKMENTS AND SIDE SLOPES 4. DEWATERING 5. BASIN MAINTENANCE 6. CONTROL OF MOSQUITOES 7. EROSION REPAIR 8. FENCE REPAIR 9. SNOW AND ICE REMOVAL 10. OTHER C. AESTHETIC MAINTENANCE WORK ITEMS ITEMS REQUIRED (X) 1. GRAFFITI REMOVAL 2. GRASS TRIMMING 3. WEEDING 4. OTHERS REMARKS (REFER TO ITEM NO. IF APPLICABLE) WORK ORDER PREPARED BY: ITEMS DONE (X) LOCATION AND COMMENTS
MAINTENANCE LOG FOR STORMWATER MANAGEMENT FACILITIES