12425 Tree Removal Application COMPLETE with Plans
817f69173ac3890ae762ac0a15ade60ef5e7345033b8f7d8acf19c6ef1f8c1aeIndexed text
INSTALLATION REQUIRES CUTTING A SMALL HOLE IN THE CORNER OF THE BAG, INSERTING THE PUMP C. APPLY PERENNIAL RYEGRASS SEED AT 1 LB. PER 1000 SQ. FT. AND ANNUAL RYEGRASS AT 1 LB. PER 1000 SQ. FT. D. MULCH STOCKPILE WITH STRAW OR HAY AT A RATE OF 90 LBS. PER 1000 SQ. FT. DISCHARGE HOSE, AND THEN SECURING THE DISCHARGE HOSE TO THE BAG WITH A HOSE CLAMP. FILTER BAGS WILL BE PLACED AS FAR AWAY FROM FLOWING STREAMS AND WETLANDS AS POSSIBLE. D4 DETAIL: SILT FENCE E. APPLY A LIQUID MULCH BINDER OR TACK TO STRAW OR HAY MULCH. C1.10 SCALE: NTS 3. PRIOR TO REMOVING A BAG FROM THE HOSE, THE BAG WILL BE TIED OFF BELOW THE END OF THE HOSE PERMANENT STABILIZATION SPECIFICATIONS ALLOWING THE BAG TO DRAIN. DRAINAGE WILL NOT BE ALLOWED THROUGH THE INLET HOLE. TO AVOID RUPTURE, THE BAGS WILL BE ATTENDED AND PUMPING RATES MONITORED. ONCE THE BAG IS INFLATED TO A
AND PUMPING RATES MONITORED. ONCE THE BAG IS INFLATED TO A 6" MIN . A. APPLY TOPSOIL TO A DEPTH OF 5 INCHES (UNSETTLED). HEIGHT OF 4 FEET, PUMPING WILL STOP TO AVOID RUPTURE. FILTER BAGS USED DURING CONSTRUCTION WILL B. APPLY GROUND LIMESTONE AT A RATE OF 90 LBS PER 1000 SQ. FT. AND WORK FOUR INCHES INTO SOIL. BE BUNDLED AND REMOVED FOR PROPER DISPOSAL. PUBLIC R.O.W. C. APPLY FERTILIZER (10-20-10) AT A OF RATE 11 LBS. PER 1000 SQ. FT. D. APPLY HARD FESCUE SEED AT 2.7 LBS. PER 1000 SQ. FT. AND CREEPING RED FESCUE SEED AT 0.7 LBS PER 1000 SQ. FT. AND PERENNIAL RYEGRASS SEED AT 0.25 LBS PER 1000 SQ. FT. 4. FILTER BAGS ARE CONSTRUCTED OF NON-WOVEN GEOTEXTILE FABRIC. A MAXIMUM OF ONE SIX INCH E. MULCH STOCKPILE WITH STRAW OR HAY AT A RATE OF 90 LBS. PER 1000 SQ. FT. EXISTING DISCHARGE HOSE WILL BE ALLOWED PER FILTER BAG. BAG CAPACITY WILL BE EXCEEDED BEYOND 2,000 F. APPLY A LIQUID MULCH BINDER OR TACK TO STRAW OR HAY MULCH. GALLONS PER MINUTE. TYPICAL BAG DIMENSIONS ARE 15 FEET BY
OR HAY MULCH. GALLONS PER MINUTE. TYPICAL BAG DIMENSIONS ARE 15 FEET BY 13.25 FEET. TO HELP PREVENT PUNCTURES, GROUND GEOTEXTILE FABRIC WILL BE PLACED BENEATH THE FILTER BAG WHEN USED IN WOODED LOCATIONS. ESTABLISHING PERMANENT VEGETATIVE STABILIZATION: UNATTENDED FILTER BAGS WILL BE ENCIRCLED WITH A HAYBALE OR SILT FENCE CORRAL. HOSE CLAMPS WILL BE USED TO SECURE THE DISCHARGE HOSE, WIRE OR STRING WILL NOT BE USED. P L A N S W H I C H D O N O T B E A R THE QUALITY OF PERMANENT VEGETATION RESTS WITH THE CONTRACTOR. THE TIMING OF SEEDING, PREPARING THE SEEDBED, APPLYING NUTRIENTS, MULCH AND OTHER MANAGEMENT ARE ESSENTIAL. LENGTH ACCORDING TO TABLE * AN EMBOSSED SEAL ARE NOT VALID. THE SEED APPLICATION RATES IN TABLE 4-3 OF THE STANDARDS FOR SOIL EROSION AND SEDIMENT CONTROL IN NEW JERSEY, LATEST EDITION, ARE REQUIRED WHEN A REPORT OF COMPLIANCE IS PROVIDE APPROPRIATE TRANSITION REQUESTED PRIOR TO ACTUAL ESTABLISHMENT OF PERMANENT VEGETATION. UP TO 50% REDUCTION IN APPLICATION RATES MAY BE USED WHEN PERMANENT VEGETATION IS ESTABLISHED PRIOR TO REQUESTING A REPORT OF
RANSITION REQUESTED PRIOR TO ACTUAL ESTABLISHMENT OF PERMANENT VEGETATION. UP TO 50% REDUCTION IN APPLICATION RATES MAY BE USED WHEN PERMANENT VEGETATION IS ESTABLISHED PRIOR TO REQUESTING A REPORT OF COMPLIANCE FROM THE DISTRICT. D1 DETAIL: FILTER BAG FOR TRENCH DEWATERING BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND PUBLIC R.O.W. ALL DOCUMENTS PREPARED BY HUDSON ENGINEERING, LLC ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE
PROJECT. THEY ARE NOT INTENDED OR REPRESENTED C1.10 SCALE: NTS TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON E X T E N S I ON S OF T HE P R O JE C T O R O N A N Y OT HE R THESE RATES APPLY TO ALL METHODS OF SEEDING. ESTABLISHING PERMANENT VEGETATION MEANS 80% VEGETATIVE COVER (OF THE SEEDED SPECIES) AND MOWED ONCE. PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION LENGTH ACCORDING TO TABLE * OR ADAPTATION BY HUDSON ENGINEERING, LLC FOR THE
SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE NOTE THIS DESIGNATION OF MOWED ONCE DOES NOT GUARANTEE THE PERMANENCY OF THE TURF SHOULD OTHER MAINTENANCE FACTORS BE NEGLECTED OR OTHERWISE MISMANAGED. RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO HUDSON ENGINEERING, LLC; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS HUDSON ENGINEERING, *NOTE: 72 HOURS PRIOR TO ANY SOIL DISTURBANCE, NOTICE IN WRITING, SHALL BE GIVEN TO THE FREEHOLD SOIL CONSERVATION DISTRICT AND A PRE-CONSTRUCTION MEETING HELD. EXCESS LLC FROM ALL CLAIMS, DAMAGES, LOSSES AND
LLC FROM ALL CLAIMS, DAMAGES, LOSSES AND EXISTING EXPENSES ARISING OUT OF OR RESULTING THEREFROM FLOW GROUNDS PUBLIC R.O.W. CONSTRUCTION SEQUENCE 1. INSTALL CONSTRUCTION ENTRANCE AND OTHER EROSION CONTROL MEASURES INCLUDING SILT FENCING - 1 WEEK BY CHK 2. CLEAR & DEMO SITE, ROUGH GRADING - 1 WEEK ----
---- ---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- 2 EACH DUMP 3. REMOVE EXISTING GRAVEL - 1 WEEK STRAPS