---- ---- ---- ---- 4. CONSTRUCT TURFSTONE - 2 WEEKS 5. REMOVE ALL EROSION CONTROL STRUCTURES -1 DAY

Page 16

DATE ---- ---- ---- ----

Page 16

---- ---- ---- ---- ----

Page 16

---- ---- ---- ---- ----

Page 16

---- EXPANSION RESTRAINT *NOTE: INDIVIDUAL LOT ACCESS POINTS MAY REQUIRE STABILIZATION. (1/4" NYLON ROPE, THICKNESS SHOWN IS FOR STONE CONSTRUCTION ENTRANCE ONLY (TYP.). 2" FLAT WASHERS) LENGTH OF STONE REQUIRED INSTALLATION DETAIL BAG DETAIL PERCENT SLOPE

Page 16

BAG DETAIL PERCENT SLOPE OF ROADWAY COARSE GRAINED SOILS FINE GRAINED SOILS DUMP 0 TO 2% 50 FT. 100 FT. STRAP NOTES ON STORM SEWER INLET PROTECTION: 2 TO 5% 100 FT. 200 FT. REVISION ENTIRE SURFACE STABILIZED WITH HOT MIX ASPHALT

Page 16

ENTIRE SURFACE STABILIZED WITH HOT MIX ASPHALT ---- ---- ---- ---- ----