Supporting Documentation · May 6, 2026
12425 Tree Removal Application COMPLETE with Plans
817f69173ac3890ae762ac0a15ade60ef5e7345033b8f7d8acf19c6ef1f8c1aeIndexed text
---- ---- ---- ---- 1. MUST SLOW THE STORM WATER TO PROVIDE THE COARSE
1. MUST SLOW THE STORM WATER TO PROVIDE THE COARSE >5% BASE COURSE, MIX I-2 1 1" REBAR SEDIMENT PARTICLES A CHANCE TO SETTLE, AND PROVIDE FOR BAG AN AREA TO RETAIN THE PARTICLES THAT HAVE SETTLED. 1. AS PRESCRIBED BY LOCAL ORDINANCE OR OTHER GOVERNING AUTHORITY. REMOVAL DUMP FROM STRAP 2. IN ALL CASES, INLET PROTECTION SHOULD NOT INLET COMPLETELY CLOSE OFF THE INLET. D5 DETAIL: STABILIZED CONSTRUCTION ENTRANCE
R 3. THE PROTECTION DEVICE WILL BE DESIGNED TO CAPTURE C1.10 SCALE: NTS No. OR FILTER RUNOFF FROM THE 1 YEAR, 24 HOUR STORM ---- ----
---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- SILTSACK AS MANUFACTURED EVENT AND SHALL SAFELY CONVEY HIGHER FLOWS BY ACF DIRECTLY INTO THE STORM SEWER SYSTEM. · OTHER METHODS THAT ACCOMPLISH THE PURPOSE OF
· OTHER METHODS THAT ACCOMPLISH THE PURPOSE OF ANCHOR PINS NO. 5 STEEL BARS CONTROL NOTES AND DETAILS STORM SEWER INLET PROTECTION MAY BE USED IF SOIL EROSION AND SEDIMENT TWO PER BALE
TWO PER BALE NEW JERSEY APPROVED BY THE SOIL CONSERVATION DISTRICT. · INSPECTIONS SHALL BE FREQUENT. MAINTENANCE, REPAIR, AND REPLACEMENT SHALL BE MADE PROMPTLY, AS 262-270 MAIN ST SITE REDEVLOPMENT NEEDED. THE BARRIER SHALL BE REMOVED
NEEDED. THE BARRIER SHALL BE REMOVED WHEN THE AREA DRAINING TOWARD THE INLET HAS BEEN STABILIZED. · THE CONTRACTOR SHALL INSTALL STORM SEWER INLET STOCKPILE JORGE MASTROPIETRO ARCHITECTS PROTECTION IN ACCORDANCE WITH THE SE&SC IN NJ, #30, JULY 1999.
JULY 1999. OF ERODIBLE MATERIAL SITE CIVIL DESIGN INLET SEDIMENT CONTROL DEVICE DETAIL D2 DETAIL: INLET SEDIMENT CONTROL DEVICE ESSEX C1.10 SCALE: NTS
File revisions (1)
- Sep 29, 2026
817f69173ac38,852,437 bytes