Supporting Documentation · May 6, 2026
12425 Tree Removal Application COMPLETE with Plans
817f69173ac3890ae762ac0a15ade60ef5e7345033b8f7d8acf19c6ef1f8c1aeIndexed text · page 15
Show all pages---- ---- REMOVE WIRE BASKET COMPLETELY. 11.FLOOD TREES WITH WATER WITHIN THE FIRST 24 HOURS OF 8' X 2" DIA. CEDAR STAKE, PLANTING. DRIVEN 30" INTO THE X 12.NSTALL PHC TREE SAVER MYCORRHIZAL FUNGAL TRANSPLANT GROUND, SET OUTSIDE INOCULANT FOR TREES AND SHRUBS. INSTALL ONE 3 OUNCE ROOT BALL NOTES: PACKET PER CALIPER INCH OR PER 1 FOOT OF ROOTBALL DIA. 13.CONTRACTOR SHALL HAVE A GUARANTEE PERIOD OF 2 YEARS FINISHED GRADE 1. DO NOT PRUNE EVERGREEN SHRUBS EXCEPT TO REMOVE DEAD AND BROKEN FOR EACH TREE PLANTED.
REMOVE DEAD AND BROKEN FOR EACH TREE PLANTED. BRANCHES. THIN BRANCHES AND FOLIAGE (NOT ALL BRANCH TIPS) BY 1/3 RETAINING PLAN 14.TOPSOIL SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS: NORMAL PLANT SHAPE. 14.1. NATURAL LOAM WITH THE ADDITION OF COMPOST OR HUMUS 2. SHRUBS SHALL BEAR THE SAME RELATIONSHIP TO GRADE AS IT BORE TO PREVIOUS REVISION 14.2. ORGANIC MATTER CONTENT SHALL BE BETWEEN 5% - 12% GRADE IN NURSERY ----
---- ---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- 14.3. THE pH SHALL BE IN THE RANGE OF 6.0 TO 7.0 INCLUSIVE, 8' LONG 2" DIA CEDAR 3. INSTALL PHC TREE SAVER MYCORRHIZAL FUNGAL TRANSPLANT INOCULANT. INSTALL UNLESS OTHERWISE APPROVED OR SPECIFIED. STAKES SET OUTSIDE ONE 3 OUNCE PACKET PER CALIPER INCH OR PER 1 FOOT OF ROOTBALL DIA. FOR
RHODODENRONS, AZALEAS AND MOUNTAIN LAURELS USE ERICOID MYCORRHIZAL NTS UNDISTURBED GRADE OF ROOTBALL 14.4.SOIL TEXTURAL ANALYSIS: TOP SOIL SHALL CONSIST OF THE FUNGI. FOLLOWING PERCENTAGES OF SAND, SILT, AND CLAY. ANY SCARIFY EDGES 4. WATER PLANTS THOROUGHLY AFTER PLANTING. SOIL THAT DOES NOT MEET THE REQUIREMENTS BELOW WILL OF EXCAVATION BE REJECTED AND REMOVED FROM THE SITE. ROCKS, STONE AND GRAVEL >2.0 mm BACKFILL WITH NEW <5% SAND (0.05-2.0 mm) TOPSOIL 40 - 60% SILT (0.002 - 0.05mm) 20 - 50% NTS
No. 2.5 x ROOTBALL DIAMETER ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- ----
---- CLAY (<0.002 mm) 20% MAXIMUM 14.5. WHEN TOPSOIL OTHERWISE COMPLIES REQUIREMENTS OF THE SPECIFICATION BUT SHOWS A WITH THE 3 SHRUB AND GROUNDCOVER PLANTING DETAIL DEFICIENCY IN ORGANIC MATTER, COMPOST MAY BE INCORPORATED WHEN AND AS PERMITTED BY THE C1.06 SCALE: N.T.S FORESTER. NEW JERSEY 15.ROOT BALL SIZE RELATIVE TO TREE HEIGHT SHALL BE WITHIN THE RANGES SET BY THE AMERICAN NURSERY STANDARDS
File revisions (1)
- Sep 29, 2026
817f69173ac38,852,437 bytes