Supporting Documentation · May 6, 2026
12425 Tree Removal Application COMPLETE with Plans
817f69173ac3890ae762ac0a15ade60ef5e7345033b8f7d8acf19c6ef1f8c1aeIndexed text · page 16
Show all pages---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- ---- 4. CONSTRUCT TURFSTONE - 2 WEEKS 5. REMOVE ALL EROSION CONTROL STRUCTURES -1 DAY
DATE ---- ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- EXPANSION RESTRAINT *NOTE: INDIVIDUAL LOT ACCESS POINTS MAY REQUIRE STABILIZATION. (1/4" NYLON ROPE, THICKNESS SHOWN IS FOR STONE CONSTRUCTION ENTRANCE ONLY (TYP.). 2" FLAT WASHERS) LENGTH OF STONE REQUIRED INSTALLATION DETAIL BAG DETAIL PERCENT SLOPE
BAG DETAIL PERCENT SLOPE OF ROADWAY COARSE GRAINED SOILS FINE GRAINED SOILS DUMP 0 TO 2% 50 FT. 100 FT. STRAP NOTES ON STORM SEWER INLET PROTECTION: 2 TO 5% 100 FT. 200 FT. REVISION ENTIRE SURFACE STABILIZED WITH HOT MIX ASPHALT
ENTIRE SURFACE STABILIZED WITH HOT MIX ASPHALT ---- ---- ---- ---- ----
---- ---- ---- ---- ----
File revisions (1)
- Sep 29, 2026
817f69173ac38,852,437 bytes