Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 15, 2026

Stormwater Maintenance Plan 10222025 4920 5008 39592

Preserved file SHA-256a42ce606aa25a3e657a5b3b6b162e791ff9e89c4c49a230dc8c370772a20426e

Indexed text · page 3

Show all pages
Page 3

Stormwater Maintenance Plan for 525 Northfield Avenue, Lot 1.01, Block 159.04 Township of West Orange, Essex County, New Jersey Jarmel Kizel Project No. Gomesgr24-223 October 22, 2025 Jarmel Kizel has only assembled these maintenance documents as per the guidance of the NJDEP. All responsibility and costs associated with the operation and maintenance of the stormwater management system including but not limited to the detention facilities is solely with the owner and/or his other designated managers, operators, contractors and maintenance personnel. The owner/maintainer is solely responsible for adhering to any supplier or manufacturer requirements and directions whether or not included in these documents. The owner/maintainer is also solely responsible for following all safety protocols including but not limited to the occupational safety and hazard act whether or not included in this document. Part I- Maintenance Plan A. List of Stormwater Management Measures The stormwater management measures incorporated into this development are listed below. The corresponding Field Manuals for the stormwater management measures are located in Part Il of the Maintenance Plan. Type of Stormwater State Plane Management BMP No. | Location Description | Coordinates / Measure Lat.,Long. | Stone een Multiple locations 40°46'14"N On-site 74°16'36"W system

File revisions (1)