Supporting Documentation · Apr 15, 2026
Stormwater Maintenance Plan 10222025 4920 5008 39592
a42ce606aa25a3e657a5b3b6b162e791ff9e89c4c49a230dc8c370772a20426eIndexed text · page 7
Show all pagesStormwater Maintenance Plan for 525 Northfield Avenue, Lot 1.01, Block 159.04 Township of West Orange, Essex County, New Jersey Jarmel Kizel Project No. Gomesgr24-223 October 22, 2025 Preventative Maintenance Actions | Frequency Preventative Maintenance Actions Stormwater Measures/ No. Monthly Vegetation mowing and removal in ‘Inlets— growing season Quarterly Sediment removal and examine Inlets and Culvert system for debris, ensure inlets are clean and other semiannual | preventative maintenance actions. Basin Structural Inspection Other annual preventative maintenance actions- examine inlets, access points and other system components Unscheduled | Quick inspection after every rain of Inlets and Culvert one (1) inch or more | Video inspect Culvert every 5 years Corrective Maintenance Actions Potential Corrective Stormwater Management Maintenance Actions Measures/No. - Repair/Replacement of inlet castings Inlets 1 Inspection and Logs of All Preventative and Corrective Maintenance The person responsible for maintenance shall maintain a detailed log of all preventative and corrective maintenance for the structural stormwater management measures incorporated into the design of the development, including a record of all inspections and copies of all maintenance-related work orders. A maintenance plan shall include a schedule of regular inspections and tasks, and detailed logs of all preventative and corrective maintenance performed on the stormwater management measure, including all maintenance-related work orders. The person with maintenance responsibility must retain and, upon request, make available the maintenance plan and associated logs and other records for review by a public entity with administrative, health, environmental, or safety authority over the site.
File revisions (1)
- Sep 29, 2026
a42ce606aa251,165,062 bytes