Supporting Documentation · Apr 15, 2026
Stormwater Management Report 4898 2292 85031
8d87c44aba7a72d151be72deaef2cff9bbbc23ab480605ed2a16ebd8c2456a56Indexed text · page 184
Show all pagesClient: Gomes Management Project: 525 Northfield Avenue, West Orange, NJ Page: 10 Date: 09/03/2024 to be followed in the design and construction of the proposed project. There may be subsurface conditions not disclosed by the explorations adequately identify subsurface conditions for the purpose of this study. If during construction any differences are found between the report of the explorations and the actual subsurface conditions, they should be brought to our attention immediately so that the effect in our recommendations can be evaluated. This report has been prepared in accordance with generally accepted Geo-technical Engineering practices for the exclusive use of our client, Gomes Management and their designated representative(s). No other warranty, express or implied, is made. Contractors’ wishes to use the soil boring information may do at their own risk. Unless specifically indicated to the contrary in this report, this report does not address environmental considerations, which may affect the site development. The conclusions and recommendations of this report are not intended to supersede or overlook any N.J.D.E.P. Environmental conditions, which should be reflected in the site planning. Should you have any questions or require additional information, please do not hesitate to contact the undersigned at (908)754-8383. Sincerely, ANS Consultants, Inc. Atulkumar N. Shah, PE, PP, F. ASCE President NJ PE License #24GE03443900 ANS/RM Reported: Gomes Management- (3); File — (1) File: ANV-6549_01.SB
File revisions (1)
- Sep 29, 2026
8d87c44aba7a21,477,603 bytes