Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 15, 2026

Traffic Impact Study 11102025 4927 7608 81845

Preserved file SHA-256613a2c100898c937efae9f53ee337370b49c3ffdaef174959ebb570a47d3c213

Indexed text · page 30

Show all pages
Page 30

2918 25-03616 Build - AM 10: Northfield Avenue & Sheridan Avenue SQB Synchro 12 Report 11/07/2025 Lanes, Volumes, Timings Lane Group EBL EBT WBT WBR SBL SBR Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 4.1 3.4 4.1 31.8 LOS A A A C Approach Delay (s/veh) 3.4 4.1 31.8 Approach LOS A A C Queue Length 50th (ft) 3 55 106 53 Queue Length 95th (ft) 11 92 168 107 Internal Link Dist (ft) 577 121 322 Turn Bay Length (ft) 50 Base Capacity (vph) 266 3365 3484 705 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.09 0.25 0.40 0.19 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 55 (61%), Referenced to phase 2:EBTL and 6:WBT, Start of Yellow Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.50 Intersection Signal Delay (s/veh): 5.4 Intersection LOS: A Intersection Capacity Utilization 49.3% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 10: Northfield Avenue & Sheridan Avenue

File revisions (1)