Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 15, 2026

West Orange Application Site Plan Checklist 11102025 kak REVISED 4905 5465 81691

Preserved file SHA-256a9ddf21239ee4cb8fa9f8de6b8f5b47366aca1373aab71c4ab6aabaee8a65f36

Indexed text · page 3

Show all pages
Page 3

ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY LICENSED PROFESSIONAL. Pre-Application - Concept Plan Major Application COMPLETE INCOMPLETE WAIVER REQUESTEDMinor Application General Development Plan Subdivision Site Plan Item Number Description Subdivision Site Plan Preliminary Final Preliminary Final 23. Item: List of required regulatory approvals or permits. Comment: Basic planning information. ∉ X X X X X 24. Item: List of variances required or requested. ∉ Comment: Basic planning information. X X X X X X 25. Item: Requested or obtained design waivers or exceptions. ∉ Comment: Describes location of all adjacent structures; not necessary at pre-application-concept plan stages; required at site plan stages; required at site plan only if notice is required by ordinance. X X X X X X 26. Item: Payment of application fees. Comment: Fee not imposed for pre-application conference. X X X X X X X X 27. Item: Property owners and lines of all parcels within 200' identified on most recent tax map sheet. Comment: Describes location of all adjacent structures; not necessary at pre-application-concept plan stages; required at site plan only if notice is required by ordinance. X X X X X X 28. Item: All existing street, water courses, flood plains, wetlands or other environmentally sensitive areas on and within 200' of site. Comment: while detailed specification of environmentally sensitive areas may not be necessary at pre-application-concept plan and GDP stages, general specification of and sensitivity to such conditions is an important planning consideration. X X X X X X X 29. Item: Existing right-of-way and/or easements on and within 200' of tract. Comment: Rights-of-way and easements are often unknown at the pre-application-concept (see however, item 28). X X X X X X X 30. Item: Topographical features of subject property from U.S.G.S. map. Comment: More detailed topographic information is needed for major subdivision. X X X

File revisions (1)