Supporting Documentation · Apr 15, 2026
Stormwater Management Report Revised as of 01282026 4936 0314 8685 v2
f6777d506bee83c79ba913bab178b45234e55066fd88f20823a02a45d6fdf50bIndexed text · page 116
Show all pages24-223 DRAINAGE DESIGN-EXISTING-UPDATE NOAA 24-hr D 100-Year-2050 Rainfall=11.52", P2=4.09" Prepared by Jarmel Kizel Architects & Engnrs Printed 1/28/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 107 Summary for Subcatchment E2B-P: E2B PERVIOUS Runoff = 0.15 cfs @ 12.03 hrs, Volume= 904 cf, Depth= 8.17" Routed to Link E-DP 2 : EXIST DP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.50 hrs NOAA 24-hr D 100-Year-2050 Rainfall=11.52", P2=4.09" Area (sf) CN Description 1,329 74 >75% Grass cover, Good, HSG C 1,329 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.7 100 0.0900 0.35 Sheet Flow, sheet flow Grass: Short n= 0.150 P2= 4.09" 0.6 88 0.0250 2.55 Shallow Concentrated Flow, Lawn Unpaved Kv= 16.1 fps 5.3 188 Total
File revisions (1)
- Sep 29, 2026
f6777d506bee6,037,476 bytes