Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 15, 2026

Stormwater Management Report Revised as of 01282026 4936 0314 8685 v2

Preserved file SHA-256f6777d506bee83c79ba913bab178b45234e55066fd88f20823a02a45d6fdf50b

Indexed text · page 151

Show all pages
Page 151

24-223 DRAINAGE DESIGN-PROPOSED-UPDATE NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 1/28/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment P1-I: P1 IMPERVIOUS PARKING Runoff = 1.31 cfs @ 12.01 hrs, Volume= 8,561 cf, Depth= 5.14" Routed to Link 11L : Proposed Disturbed Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.50 hrs NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Area (sf) CN Description * 19,976 98 Uncovered Paved parking, HSG C 19,976 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 100 0.0150 1.12 Sheet Flow, sheet flow Parking area n= 0.013 P2= 3.47" 0.9 127 0.0150 2.49 Shallow Concentrated Flow, parking area Paved Kv= 20.3 fps 0.3 198 0.0449 12.08 14.83 Pipe Channel, Pipe flow 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 2.7 425 Total

File revisions (1)