Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 15, 2026

Stormwater Management Report Revised as of 01282026 4936 0314 8685 v2

Preserved file SHA-256f6777d506bee83c79ba913bab178b45234e55066fd88f20823a02a45d6fdf50b

Indexed text · page 170

Show all pages
Page 170

24-223 DRAINAGE DESIGN-PROPOSED-UPDATE NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 1/28/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 48 Summary for Link P-DP 2: PROP DP 2 Inflow Area = 17,329 sf, 54.94% Impervious, Inflow Depth = 4.03" for 10-Year-2020 event Inflow = 0.91 cfs @ 12.02 hrs, Volume= 5,818 cf Primary = 0.91 cfs @ 12.02 hrs, Volume= 5,818 cf, Atten= 0%, Lag= 0.0 min Routed to Link 15L : TOTAL PROPOSED Primary outflow = Inflow, Time Span= 0.00-36.00 hrs, dt= 0.50 hrs Link P-DP 2: PROP DP 2 Hydrograph Inflow 1 0.91 cfs Primary 0.91 cfs Inflow Area=17,329 sf Flow (cfs) 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours)

File revisions (1)