Stormwater Management Report Revised as of 01282026 4936 0314 8685 v2
f6777d506bee83c79ba913bab178b45234e55066fd88f20823a02a45d6fdf50bIndexed text · page 20
Show all pages24-223 DRAINAGE DESIGN-EXISTING-UPDATE NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 1/28/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment E2-IMP: E2A IMPERVIOUS Runoff = 0.51 cfs @ 12.01 hrs, Volume= 3,246 cf, Depth= 3.24" Routed to Link E-DP 2 : EXIST DP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.50 hrs NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Area (sf) CN Description 4,643 98 Roofs, HSG C 7,392 98 Paved parking, HSG C 12,035 98 Weighted Average 12,035 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 100 0.0550 2.15 Sheet Flow, Pavement Smooth surfaces n= 0.011 P2= 3.47" 1.2 335 0.0550 4.76 Shallow Concentrated Flow, shadow concentrate Paved Kv= 20.3 fps 2.0 435 Total
File revisions (1)
- Sep 29, 2026
f6777d506bee6,037,476 bytes