Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 15, 2026

Stormwater Management Report Revised as of 01282026 4936 0314 8685 v2

Preserved file SHA-256f6777d506bee83c79ba913bab178b45234e55066fd88f20823a02a45d6fdf50b

Indexed text · page 235

Show all pages
Page 235

24-223 DRAINAGE DESIGN-PROPOSED-UPDATE NOAA 24-hr D 10-Year-2050 Rainfall=6.37", P2=4.09" Prepared by Jarmel Kizel Architects & Engnrs Printed 1/28/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 113 Summary for Link P-DP 1: PROP DP 1 Inflow Area = 116,005 sf, 62.48% Impervious, Inflow Depth = 5.02" for 10-Year-2050 event Inflow = 7.08 cfs @ 12.04 hrs, Volume= 48,528 cf Primary = 7.08 cfs @ 12.04 hrs, Volume= 48,528 cf, Atten= 0%, Lag= 0.0 min Routed to Link 15L : TOTAL PROPOSED Primary outflow = Inflow, Time Span= 0.00-36.00 hrs, dt= 0.50 hrs Link P-DP 1: PROP DP 1 Hydrograph Inflow 7.08 cfs Primary 7 7.08 cfs Inflow Area=116,005 sf 6 5 Flow (cfs) 4 3 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours)

File revisions (1)