Stormwater Management Report Revised as of 01282026 4936 0314 8685 v2
f6777d506bee83c79ba913bab178b45234e55066fd88f20823a02a45d6fdf50bIndexed text · page 74
Show all pages24-223 DRAINAGE DESIGN-EXISTING-UPDATE NOAA 24-hr D 2-Year-2050 Rainfall=4.09", P2=4.09" Prepared by Jarmel Kizel Architects & Engnrs Printed 1/28/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment E2-IMP: E2A IMPERVIOUS Runoff = 0.60 cfs @ 12.01 hrs, Volume= 3,866 cf, Depth= 3.85" Routed to Link E-DP 2 : EXIST DP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.50 hrs NOAA 24-hr D 2-Year-2050 Rainfall=4.09", P2=4.09" Area (sf) CN Description 4,643 98 Roofs, HSG C 7,392 98 Paved parking, HSG C 12,035 98 Weighted Average 12,035 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.7 100 0.0550 2.33 Sheet Flow, Pavement Smooth surfaces n= 0.011 P2= 4.09" 1.2 335 0.0550 4.76 Shallow Concentrated Flow, shadow concentrate Paved Kv= 20.3 fps 1.9 435 Total
File revisions (1)
- Sep 29, 2026
f6777d506bee6,037,476 bytes