Supporting Documentation · May 28, 2026
Prior Resolutions of Approval submission
bb31006bbb79f35f308cc95608510940a3a996a02195a8c6f317b79cef192b40Indexed text · page 52
Show all pagesand Board Engineers. Add a note that any buried structures are to be uncovered and raised to grade. Redesign the sanitary sewer from San. MH #1 to San. MH#4 to reduce depth of excavation and minimize impact on existing trees. The handicapped spaces at the proposed field house to indicate flush concrete curb with the signs in bollards. Revise the outlet structure details to provide trash racks for all orifices and provide additional dimensioning including top and bottom of structure elevations. Add details for the flared end section, batting cages and scoreboard and revise other details to address some minor items (class of concrete, size of trench grate and handicapped ramp details). Provide drains for the dugouts to storm sewer or to basin(s). Landscape plans are to be revised to show utilities, lights and fencing with any conflicts with these features to be resolved. Compliance with the parking lot tree requirements to be verified and calculations provided on the plans. A note is to be placed on the site plans that Basin 200 is classified as a Class IV dam and appropriate details are to be provided for its construction in accordance with the Dam Safety standards. Discrepancies between the storm sewer profile and’ plan are to be corrected. Selective clearing of dead and diseased trees is to be done under supervision of certified tree expert or the Township Forester. Prior to Seton Hall commencing any tree removal at the Subject Property, it must prepare and submit to the Township Planner and monitor and implement a woodland/forest management plans for the remaining wooded areas to ensure their health and vitality. -52-
File revisions (1)
- Sep 29, 2026
bb31006bbb794,371,560 bytes