Supporting Documentation · May 28, 2026
Prior Resolutions of Approval submission
bb31006bbb79f35f308cc95608510940a3a996a02195a8c6f317b79cef192b40Indexed text · page 53
Show all pages34. Install a higher fence on the east end of the existing practice field (east of the existing field house) used for lacrosse practice to prevent lacrosse balls from impacting the residences on Northfield Avenue. 35. Seton Hall will comply with the U.S. Fish and Wildlife Service’s conditions with regard to the timing of the removal of trees and any other requirements of the U.S. Fish and Wildlife Service. Tree removal on the entire Subject Property is only permitted between October 1 and March 31, or other time periods sanctioned by the US Fish and Wildlife Service. 36. During the months of June, July and August, the athletic fields can only be used directly by Seton Hall Prep and its own students or athletes and not by Seton Hall coaches or third parties to conduct other athletic or sports sessions or training camps (whether for pay or not). 37. There shall be no installation of any field lights on any of the fields, whether on a permanent or temporary basis. 38. Applicant shall remove any existing field lights, which must be accomplished by no later than December 31, 2010. 39. No marching bands can practice on the Subject Property. 40. Seton Hall Prep can have no more than eight home football games per school year at the Subject Property, excluding games played by another school using the Subject Property in the event of a necessity. 41. At the Subject Property, Seton Hall Prep can conduct no more than one athletic event at the same time (with the exception of tennis and baseball), and to the extent that two or more events are scheduled at the Subject Property on the same date, there must be at least a 1.5 hour time period between the conclusion of one game of any sport and the commencement of the next game of any sport. 42. The existing path running through the northerly portion currently used as a running track shall remain in its current location, but Seton Hall must resurface the path and the side edgings to prevent any deterioration of the pathway. 43. The consolidation of the various lots into a single lot by deed filed with the Recorder of Deeds of Essex County is to be completed no later than 60 days after a final non-appealed decision of the Township Council or 60 days after the last -53-
File revisions (1)
- Sep 29, 2026
bb31006bbb794,371,560 bytes