Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 28, 2026

Prior Resolutions of Approval submission

Preserved file SHA-256bb31006bbb79f35f308cc95608510940a3a996a02195a8c6f317b79cef192b40

Indexed text · page 71

Show all pages
Page 71

WHEREAS, the Applicant submitted proof of notice of the hearing upon all property owners within 200 feet of the property and all others required to receive notice; and WHEREAS, the Application was heard at public meetings of the Board held on June 16, 2016 and July 21, 2016; and WHEREAS, the Applicant was represented by attorney Robert C. Williams, Esq.; and WHEREAS, the applicant presented the testimony of Charles J. Stewart, P.E., a licensed professional engineer in the State of New Jersey, who was recognized as such, Mr. Stewart testified that the plans have been amended to upgrade the football field from grass to artificial turf, to replace the existing scoreboard, to revise the location of proposed batting cages and the shot-put area, to add retaining walls and walks, to add bleachers and walkways to the varsity baseball field area, to add utility poles to revise the proposed concrete walk and wall layout, to add walkways by the tennis courts, to revise the sewer, water and electric utility layout, to replace the proposed rain garden with a manufactured treatment device, to add a type “A” inlet and HDPE pipe to discharge into detention basin P-200 and to replace the proposed curb island with a painted island, and further explained that these site changes were desired by the Applicant as construction of the already approved improvements was ongoing and as dictated by field conditions; and

File revisions (1)