Supporting Documentation · May 28, 2026
Prior Resolutions of Approval submission
bb31006bbb79f35f308cc95608510940a3a996a02195a8c6f317b79cef192b40Indexed text · page 89
Show all pagesFINAL — V1 — SKW - 10.18.23 proposed stairways, and 28' tall, as measured from the top of proposed rooftop parapets, while the existing maintenance/storage building is 21' tall; (ix) by way of relocating the athletic training activities occurring within the southern field house to the proposed fitness center, which is located to the interior of the Property, on-site activity would have less of an impact to surrounding properties than it has presently; and (x) after taking sound readings from six (6) different points around the Property, and considering the noise generated by current training activities occurring within the southem field house, he is confident that no on-site activity would exceed permissible decibel thresholds. 14. On questioning by members of the Board and Board Professionals, Mr. Fiore testified that: (i) the Applicant plans to install solar panels on the roof of the proposed fitness center but cannot commit to doing so until a design is put together, (ii) the Applicant does not, as of the June 22, 2023 hearing, propose to add any further landscaping to the Property; (iii) the proposed fitness center likely will not be visible from the residences located about 1250 south of that location; (iii) the proposed fitness center would have about 9,596 square feet of floor area; (iv) because of poor water pressure, the Applicant would likely be unable to efficiently install sustainable water appliances on-site; (v) the proposed fitness center would feature a flat roof with parapets that would effectively screen any roof-mounted HVAC equipment; (vi) the proposed fitness center would feature overhead doors only on its west facade; (vii) lawn maintenance equipment, if any, is stored in the existing storage/maintenance building and would be stored in the southern field house; (viii) the height of the backstop on the nearby baseball field would prevent any wanton baseballs from hitting the proposed fitness center's glazing; (ix) egress from the proposed fitness center would be provided via doors next to both proposed stairwells; (x) the second floor balcony of the proposed fitness center will likely host a variety of activities, but be
File revisions (1)
- Sep 29, 2026
bb31006bbb794,371,560 bytes