Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 15, 2026

2026 03 06 Review 3

Preserved file SHA-256c90627b921b9d626949ae11ec02527546cf37786b366fa7b9e9190e5065de9a9

Indexed text · page 6

Show all pages
Page 6

Chairman and Members of the West Orange Township Planning Board March 6, 2026 Re: 525 Northfield Ave., LLC (PB 25-11) Our File No. 115.WRP0159.V02 Preliminary and Final Site Plan and Conditional Use with Page 6 ‘C’ Variances and Tree Removal Permit - Review #3 H:\Legacy\Howell-FS1\SEC\West Orange\Planning Board\115.WRP0159.V02 - 525 Northfield Ave LLC (PB-25-11)\2026-03-06 - Review #3.docx 2. The Applicant should address the Board regarding their plans to provide assigned parking spaces at the site. If assigned parking is proposed, then details of the proposed signage must be added to the plans. 3. The parking spaces that will be set aside for the commercial use must be clearly identified on the plans and the appropriate signage provided. 4. The Applicant should clarify if any of the proposed parking spaces will be set aside for visitors. If so, then the visitor spaces must be clearly identified on the plans and the appropriate signage provided. D. STORMWATER MANAGEMENT COMMENTS 1. The proposed development will result in the disturbance of more than 0.5 acres. As a result, this project is classified as a Major Development and is subject to the stormwater management requirements set forth in §25-29.4 of the Land Use Regulations. 2. As required for major developments, the Applicant must submit an Environmental Site Analysis to the Board as required by §25-29.10c2 of the Land Use Regulations. In his January 29, 2026 letter, Anthony Facchino, PE, PLS, PP states that the Applicant is requesting a waiver from this requirement. 3. As required by §25-29.14 of the Land Use Regulations, the Applicant must file a stormwater permit application with the Township. In his January 29, 2026 letter, Anthony Facchino, PE, PLS, PP requests that the submission of a stormwater permit application be a condition of approval. 4. The Applicant proposes to collect the stormwater runoff from the majority of the roof and parking areas and discharge it into the Turtle Brook culvert which traverses the site. A small portion of the roof runoff at the southwest corner of the building will be collected and discharged into the County drainage system in Sheridan Avenue at the intersection with Northfield Avenue. It states in the Stormwater Management Report that the project will result in a reduction of the impervious cover at the site by 3,265 sf. 5. As required by §25-29.3a2 of the Land Use

Page 6

rthfield Avenue. It states in the Stormwater Management Report that the project will result in a reduction of the impervious cover at the site by 3,265 sf. 5. As required by §25-29.3a2 of the Land Use Regulations, the stormwater management system must be designed to meet the minimum standards for groundwater recharge, stormwater quality and stormwater runoff quantity by incorporating green infrastructure. We note that since this site was previously developed, the Applicant is exempt from the groundwater recharge requirements. In addition, since there will not be a net increase of motor vehicle surface, the Applicant is not required to address stormwater runoff quality requirements. 6. As required by §25-29.4s3(b) of the Land Use Regulations, the design engineer must demonstrate through hydrologic and hydraulic analysis that there is no increase, as compared to the pre-construction condition, in the peak runoff rates of stormwater leaving the site for the current and projected two-, ten- and 100-year storm events and that the increased volume or change in timing of stormwater runoff will not increase flood damage at or downstream of the site.

File revisions (1)