Supporting Documentation · Mar 19, 2026
26 03 17 Engineering Review 6
4346daa3bd759213d3702f0d4f840a02f5db8b891a5dba714bcfd215dc8411b0Indexed text · page 2
Show all pages= . Consulting & Municipal ENGINEERS "ASSOCIATES A Subsidiary of Artheon, inc. Chairman and Members of the West Orange Township Zoning Board March 17, 2026 Re: MPB Realty, LLC (ZB-22-13) Our File No. 115.WRZ0153.V01 (60002) Preliminary & Final Major Site Plan and Conditional Use Permit Page 2 with 'C’ & ‘D’ Variances and Tree Removal Permit - Review #6 which addresses the comments in the February 5, 2026 letter from the Township Forrester, Walt Kipp. In addition to the above, our office previously received the following information as part of the prior submissions for this application: Aset of Preliminary and Final Site Plan drawings (23 sheets) prepared Matthew J. Bersch, PE with Dynamic Engineering of Lake Como, New Jersey and bearing a latest revision date of November 25, 2025. A print of a Proposed Roof Plan (1 sheet) prepared by Robert A. Grimaldi, RA with G141 Architecture, LLC of Kenilworth, New Jersey and bearing a latest revision date of September 29, 2025. A set of architectural plans (2 sheets) prepared by Robert A. Grimaldi, RA dated June 12, 2024. A print of a Boundary and Topographic Survey (1 sheet) prepared Craig Black, PLS with Dynamic Survey, LLC of Lake Como, New Jersey dated May 13, 2021. A Drainage Statement prepared by Matthew J. Bersch, PE and bearing a latest revision date of February 2025. Included with the Drainage Statement is a set of Drainage Area Maps (3 sheets) prepared by Dynamic Engineering and bearing a latest revision date of February 19, 2025. A Stormwater Management Operation and Maintenance Manual prepared by Matthew J. Bersch, PE dated June 2024. A Traffic Impact Study prepared by Kevin M. Savage, PE, PTOE and Corey M. Chase, PE with Dynamic Traffic of Lake Como & Chester, New Jersey and bearing a latest revision date of December 4, 2025. An Environmental Impact Statement prepared by Matthew J. Bersch, PE and bearing a latest revision date of February 2025. A Solid Waste Management Plan prepared by Matthew J. Bersch, PE dated June 7, 2024. An Acoustical Evaluation prepared by Michael J. Dick, PE, INCE Bd. Cert. with Lewis S. Goodfriend & Associates of Chester, New Jersey dated February 3, 2025. An October 4, 2025 Memorandum from Michael Dick with Lewis S. Goodfriend & Associates to Lawrence BenBassett with PN Restaurants which states that he has reviewed the rooftop mechanical plan and calculated the
r 4, 2025 Memorandum from Michael Dick with Lewis S. Goodfriend & Associates to Lawrence BenBassett with PN Restaurants which states that he has reviewed the rooftop mechanical plan and calculated the expected sound levels at the adjacent properties and found that the sound levels will be slightly lower than those in his February 3, 2025 letter. A completed Application Form dated July 1, 2024. A completed Site Plan/Subdivision Checklist. A copy of a completed Sustainability Checklist Form. H \Legacy\Howell-FS1\SEC\West Orange\Zoning Board\VWRZ0153 01 - MPB Realty LLC\26-03-17 MPB Really - Review No. 6 docx
File revisions (1)
- Sep 29, 2026
4346daa3bd75270,294 bytes