Supporting Documentation · Mar 19, 2026
26 03 17 Engineering Review 6
4346daa3bd759213d3702f0d4f840a02f5db8b891a5dba714bcfd215dc8411b0Indexed text · page 4
Show all pagesSB & Municipal ENGINEERS “ASSOCIATES: A Subsidiary of Artheon, inc. Chairman and Members of the West Orange Township Zoning Board March 17, 2026 Re: MPB Realty, LLC (ZB-22-13) Our File No. 115.WRZ0153.V01 (60002) Preliminary & Final Major Site Plan and Conditional Use Permit Page 4 with ‘C’ & ‘D’ Variances and Tree Removal Permit - Review #6 C. STORMWATER MANAGEMENT COMMENTS 1. The Stormwater Management Operation and Maintenance Manual and any future revisions must be recorded upon the deed of record for the property. Prior to recording, the form of the deed must be approved by the Board Attorney and our office. D, LANDSCAPING AND FORESTRY COMMENTS 1. As stipulated in Section 25-12.1(0) and Section 28-4e.8., the Applicant must provide shade trees to create 50% shade for the parking areas within twenty-five (25) years; whereas it does not appear that the proposed landscaping will comply. Testimony was provided requesting relief from the requirement. E. LIGHTING COMMENTS 1. It remains for the Applicant to provide manufacturer's catalog cut sheets for the proposed light poles and provide full ordering information for all light fixtures and poles to prevent confusion during construction. The Applicant is hereby advised that any revised plans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made to the plans as these may not be readily apparent. H:\Legacy\Howell-FS 1\SEC\West Orange\Zoning Board\VWRZ0153.01 - MPB Realty LLC\26-03-17 MPB Really - Review No. 6 dacx
File revisions (1)
- Sep 29, 2026
4346daa3bd75270,294 bytes