Supporting Documentation · Apr 15, 2026
03132026 PB 25 11 Planning Review 1
9f909c94502839f752895d968b69e8c22375dbad905237c69efe6a7476384ab3Indexed text · page 2
Show all pagesMemorandum Page 2 of 16 236 BROAD STREET, RED BANK, NJ 07701 • TEL 732.741.2900 • FAX 732.741.2929 • MAIL@HGAPA.COM • www.HGAPA.com 12. Township of West Orange Verification of Taxes and Sewer Charges Paid, prepared by the Office of the Tax Collector, dated November 10, 2025; 13. Sustainability Checklist Form, undated; 14. Township of West Orange Site Plan/Subdivision Checklist; undated; 15. W-9 Request for Taxpayer Identification Number and Certification, prepared by 525 Northfield Ave., LLC, dated November 3, 2025; 16. Checklist for Tree Removal Construction Application/Projects, undated; 17. Township of West Orange Department of Public Works Tree Removal and Replacement Permit Application, dated November 13, 2025; 18. 525 Northfield Ave Traffic Impact Study, prepared by Craig Peregoy and Connor Hughes of Dynamic Traffic, dated November 10, 2025; 19. Stormwater Maintenance Plan and Field Manual for 525 Northfield Avenue, prepared by Jarmel Kizel Architects & Engineers, Inc., dated January 28, 2026 (22 pages); 20. Stormwater Management Report for Sofia by Gomes, prepared by Jarmel Kizel Architects & Engineers, Inc., dated January 28, 2026 (321 pages); 21. 525 Northfield Avenue Boundary and Topographic Survey, prepared by Michael Pronesti, PLS, dated May 14, 2025; 22. 525 Northfield Avenue Title & Topographic Survey prepared by Michael Lanzafama of Casey & Keller Inc., most recently revised as of July 1, 2011 (1 sheet); 23. List of All Trees on Property for 525 Northfield Avenue, undated; 24. Two (2) Letters to Board Secretary “Preliminary and Final Site Plan Application,” prepared by Marsha M. Moore, dated November 10, 2025 and November 18, 2025; 25. Flood Hazard Area Applicability Determination, prepared by Dennis Contois, Supervising Engineer, dated February 21, 2025; 26. Attachment to Application – Requirements for Variances, undated. 27. Transmittal Letter for 525 Northfield Avenue prepared by Post Polak, PA, dated February 6, 2026 (2 pages). 28. Response Letter for Planning Board Application No. PB-25-11 prepared by Anthony Facchino, PE, PLS, PP of Jarmel Kizel Architects & Engineers, dated January 29, 2026 (9 pages). 29. Steep Slope Ordinance 25-28 Letter for PB Application 25-11 prepared by ANS Consultants, Inc., dated January 27, 2026 (4 pages). 30. Transmittal Letter for 525 Northfield Avenue prepared by Post Polak, PA, dated March 2, 2026
28 Letter for PB Application 25-11 prepared by ANS Consultants, Inc., dated January 27, 2026 (4 pages). 30. Transmittal Letter for 525 Northfield Avenue prepared by Post Polak, PA, dated March 2, 2026 (2 pages).
File revisions (1)
- Sep 29, 2026
9f909c945028686,951 bytes