Supporting Documentation · Apr 15, 2026

Memo Regarding Revisions 03302026

Preserved file SHA-2564a6f84846f9d0fd86ed750030354a64aa7c3a196bb19a036804569952be569f3

Indexed text · page 2

Show all pages
Page 2

Preliminary and Final Major Site Plan 575 Northfield Ave., LLC Block 159.01, Lot 1.01, 1.02 & 1.03 March 31, 2026 Page 2 of 2 11. The Electrical Vehicle charging stations have all been relocated outside the building area in accordance with the Fire Department concerns 12. The proposed six-foot rear retaining wall has been removed from the plans 13. The stormwater drainage system has been updated to reflect the revised grading plan 14. The landscaping plan has been revised to provide the 51 trees required for the replacement requirement for the 27 trees being removed 15. The lighting plan has been updated in accordance with the new parking layout. 16. The stormwater Management report has been revised to reflect the reduction of impervious coverage and confirm we will continue to have a reduction in flow and volume at each design point. Should you have any questions or require additional information, please do not hesitate to contact our office. Very truly yours, Jarmel Kizel Architects and Engineers, Inc. Anthony Facchino, PE, PLS, PP Associate Director of Land Planning

File revisions (1)