Supporting Documentation · Apr 15, 2026
Stormwater Management Report 03302026
f21e274dca0e46b0f772672884e856d0c7ea7056c08892da2245c124f65038ddIndexed text · page 119
Show all pages24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment P1-P: P1 PERVIOUS Runoff = 0.08 cfs @ 12.10 hrs, Volume= 547 cf, Depth= 1.22" Routed to Link 11L : Proposed Disturbed Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Area (sf) CN Description 5,380 74 >75% Grass cover, Good, HSG C 5,380 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 83 0.0660 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.47" 0.1 36 0.0280 9.54 11.71 Pipe Channel, Yard Inlet 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 0.2 325 0.0450 31.77 898.40 Pipe Channel, 72" Culvert 72.0" Round Area= 28.3 sf Perim= 18.8' r= 1.50' n= 0.013 7.6 444 Total
File revisions (1)
- Sep 29, 2026
f21e274dca0e9,397,997 bytes