Stormwater Management Report 03302026
f21e274dca0e46b0f772672884e856d0c7ea7056c08892da2245c124f65038ddIndexed text · page 127
Show all pages24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment P3B-IMP: P3B IMPERVIOUS Runoff = 0.04 cfs @ 12.00 hrs, Volume= 264 cf, Depth= 3.24" Routed to Link P-DP 2 : PROP DP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs NOAA 24-hr D 2-Year-2020 Rainfall=3.47", P2=3.47" Area (sf) CN Description * 980 98 SIDEWALK AREA 980 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 100 0.0900 2.61 Sheet Flow, sidewalk Smooth surfaces n= 0.011 P2= 3.47" 0.5 88 0.0220 3.01 Shallow Concentrated Flow, shadow concentrate Paved Kv= 20.3 fps 1.1 188 Total
File revisions (1)
- Sep 29, 2026
f21e274dca0e9,397,997 bytes