Stormwater Management Report 03302026
f21e274dca0e46b0f772672884e856d0c7ea7056c08892da2245c124f65038ddIndexed text · page 139
Show all pages24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment P1-I: P1 IMPERVIOUS PARKING Runoff = 1.59 cfs @ 12.01 hrs, Volume= 10,412 cf, Depth= 5.14" Routed to Link 11L : Proposed Disturbed Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs NOAA 24-hr D 10-Year-2020 Rainfall=5.38", P2=3.47" Area (sf) CN Description * 24,295 98 Uncovered Paved parking, HSG C 24,295 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.5 100 0.0150 1.12 Sheet Flow, sheet flow Parking area n= 0.013 P2= 3.47" 0.9 127 0.0150 2.49 Shallow Concentrated Flow, parking area Paved Kv= 20.3 fps 0.3 198 0.0449 12.08 14.83 Pipe Channel, Pipe flow 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.012 2.7 425 Total
File revisions (1)
- Sep 29, 2026
f21e274dca0e9,397,997 bytes