Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 15, 2026

Stormwater Management Report 03302026

Preserved file SHA-256f21e274dca0e46b0f772672884e856d0c7ea7056c08892da2245c124f65038dd

Indexed text · page 202

Show all pages
Page 202

24-223 DRAINAGE DESIGN-PROPOSED-2026-03-30 NOAA 24-hr D 2-Year-2050 Rainfall=4.09", P2=4.09" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 90 Summary for Link P-DP 2: PROP DP 2 Inflow Area = 17,329 sf, 54.94% Impervious, Inflow Depth = 2.87" for 2-Year-2050 event Inflow = 0.65 cfs @ 12.02 hrs, Volume= 4,140 cf Primary = 0.65 cfs @ 12.02 hrs, Volume= 4,140 cf, Atten= 0%, Lag= 0.0 min Routed to Link 15L : TOTAL PROPOSED Primary outflow = Inflow, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs Link P-DP 2: PROP DP 2 Hydrograph Inflow 0.7 0.65 cfs Primary 0.65 0.65 cfs Inflow Area=17,329 sf 0.6 0.55 0.5 0.45 Flow (cfs) 0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours)

File revisions (1)