Supporting Documentation · Apr 15, 2026
Stormwater Management Report 03302026
f21e274dca0e46b0f772672884e856d0c7ea7056c08892da2245c124f65038ddIndexed text · page 89
Show all pages24-223 DRAINAGE DESIGN-EXISTING-2026-03-30 NOAA 24-hr D 10-Year-2050 Rainfall=6.37", P2=4.09" Prepared by Jarmel Kizel Architects & Engnrs Printed 3/30/2026 HydroCAD® 10.20-6a s/n 12607 © 2024 HydroCAD Software Solutions LLC Page 77 Summary for Subcatchment E2B-P: E2B PERVIOUS Runoff = 0.07 cfs @ 12.05 hrs, Volume= 447 cf, Depth= 3.50" Routed to Link E-DP 2 : EXIST DP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-30.00 hrs, dt= 0.50 hrs NOAA 24-hr D 10-Year-2050 Rainfall=6.37", P2=4.09" Area (sf) CN Description 1,532 74 >75% Grass cover, Good, HSG C 1,532 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.7 100 0.0900 0.35 Sheet Flow, sheet flow Grass: Short n= 0.150 P2= 4.09" 0.6 88 0.0250 2.55 Shallow Concentrated Flow, Lawn Unpaved Kv= 16.1 fps 5.3 188 Total
File revisions (1)
- Sep 29, 2026
f21e274dca0e9,397,997 bytes