Supporting Documentation · Apr 15, 2026
PB 24 05 Yerrr Canna Adopted Resolution
cba3c395b242126ddf4ee033df55ac6e4d277d7d8be57bb0f2374aefb2ba56edIndexed text · page 13
Show all pagesincluding hallways and demonstrating appropriate emergency access within the building. 8. The Applicant shall list all conditions of approval onto a final site plan submission prior to the submission of the building permit. 9. Applicant shall install a generator, the location of which must be included on the site plan. Applicant shall provide all necessary design specifications for such a generator, including noise data to demonstrate that the generator will comply with all applicable state and local noise codes, within 30-days of the issuance of a certificate of occupancy, and the installation of such a generator shall not be a condition of zoning compliance or occupancy; however, a generator shall be installed within 90 days of the issuance of a certificate of occupancy. 10. If any of the unused portion of the second floor is to be utilized for any purpose the Applicant must return to the Board for amended site plan approval and review of parking requirements. 11. The Electric Vehicle parking space must be operational from the inception of the business. 12. Applicant shall add additional light poles as may be necessary to comply with the standards of the West Orange Zoning Code and will submit a lighting plan to be approved by the Board Engineer. 13. Applicant shall repave or resurface or patch the parking lot of the Property at the direction and discretion and approval of the Zoning Officer. 14. Applicant shall stripe the parking spaces for use by its employees and label the compact car spaces and properly designate the ADA parking space. Page 13 of 15
File revisions (1)
- Sep 29, 2026
cba3c395b2426,494,870 bytes