26 03 25 Mavis Tire Planning Review 2

Preserved file SHA-256b6f5faac535c6e1ef28d92b55bb4581d4457b512bd1d98f51464e9c66384efd1

Indexed text · page 10

Show all pages
Page 10

West Orange Zoning Board March 25, 2026 Re: Mavis Tire Supply, LLC Our File No. 115.WRZ0105.V01 Planning Review #2 Page 10 "\\EgnyteDrive\Artheon\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0105.V01 - Mavis Tire Supply, LLC\26-03-06 Mavis Tire-Planning Review 2.docx" 7. Materials Submitted The following materials have been submitted and reviewed in association with this application: • A set of Preliminary and Final Site Plan drawings (20 sheets) prepared Rodman R. Ritchie, PE and Marla A. Roller, LLA with Dynamic Engineering of Marlton, New Jersey dated July 16, 2025, and a set of Preliminary and Final Site Plan drawings (19 sheets) revised February 16, 2026. • A set of unsigned architectural plans (2 sheets) prepared by Larson Design Group, Inc. of Cranberry Township, Pennsylvania, June 30, 2025, and revised February 16, 2026. • A Drainage Statement prepared by Rodman R. Ritchie, PE, PP dated July 2025. Included with the Drainage Statement is a set of Drainage Area Maps (2 sheets) prepared by Dynamic Engineering dated July 16, 2025. • A Geotechnical Engineering Report prepared by Stephen F. Patt, PE and Jeffrey C. Yates, PE with ECS Mid-Atlantic, LLC of Moorestown, New Jersey dated December 10, 2024. • A Traffic Impact Study prepared by Patrick Downey, PE, PTOE and Justin Taylor, PE, PTOE with Dynamic Traffic of Newtown, Pennsylvania dated July 21, 2025, and revised February 12, 2026. • A Tree Removal Report prepared by Marla L. Roller, LLA and Michael LaMana, LTE, with Dynamic Engineering, dated February 2026, revised to . • A Consulting Report prepared by Christine A. Nazzaro-Cofone, PP with Cofone Consulting Group of Red Bank, New Jersey dated July 22, 2025, and resubmitted February 17, 2026. • A completed Application Form dated July 16, 2025, and resubmitted February 24, 2026. • A completed Application for Tree Removal & Replacement Permit dated August 11, 2025. • A Stormwater Management Operation and Maintenance Manual, prepared by Rodman R. Ritchie, PE, PP of Dynamic Engineering, dated February 2026. • A Stormwater Management, Water Quality and Groundwater Recharge Analysis, prepared by Rodman R. Ritchie, PE, PP of Dynamic Engineering, dated July 2026, and revised February 2026. • A Preliminary List of Variances & Waivers prepared by Dynamic Engineering dated July 2025, and revised February 24, 2026. • A Stormwater Permit Application dated

Page 10

uly 2026, and revised February 2026. • A Preliminary List of Variances & Waivers prepared by Dynamic Engineering dated July 2025, and revised February 24, 2026. • A Stormwater Permit Application dated February 10, 2026. • A completed Grading Checklist dated June 2025 and revised February 2026. • A completed Site Plan/Subdivision Checklist.

File revisions (1)