Supporting Documentation · May 28, 2026
26 03 25 CME Engineering Review 2
f0b4976636a50248ef1c896fb7badb5efa22b513ad5954920cfea6ce013da1c0Indexed text · page 2
Show all pagesOe ENGINEERS Consulting & Municipal A Subsidiary of Artheon, Inc. ENGINEERS Chairman and Members of the West Orange Township Zoning Board March 25, 2026 Re: Mavis Tire Supply, LLC (ZB-25-07) Our File No. 115.WRZ0105.V01 (60001) Preliminary & Final Major Site Plan with ‘C’ & ‘D’ Page 2 Variances and Tree Removal Permit - Review #2 A Stormwater Management Operation and Maintenance Manual prepared by Rodman R. Ritchie, PE, PP dated February 2026. A Tree Removal Report prepared by Michael LaLana, LTE and Marla A. Roller, LLA with Dynamic Engineering of Marlton, New dated March 2026. A Traffic Impact Study prepared by Patrick Downey, PE, PTOE and Justin Taylor, PE, PTOE with Dynamic Traffic of Newtown, Pennsylvania and bearing a latest revision date of February 12, 2026. A Consulting Report prepared by Christine A. Nazzaro-Cofone, PP with Cofone Consulting Group of Red Bank, New Jersey dated February 17, 2026. Acompleted Township of West Orange Application for Stormwater Permit dated February 6, 2026. A completed Grading Plan Design Items - Checklist. A Preliminary List of Variances & Waivers prepared by Dynamic Engineering Consultants, PC dated February 2026 A copy of a February 19, 2026 letter from Rodman R. Ritchie, PE and Robert P. Freud, PE to the West Orange Zoning Board of Adjustment which addresses the comments in our September 29, 2025 engineering review letter and the October 23, 2025 planning review letter from Christopher N. Dochney, PP. In addition to the above, our office previously received the following information as part of the original submission for this application: A print of an ALTA/NSPE Land Title Survey (1 sheet) prepared by James A. Conway Jr., PLS with Dynamic Survey, LLC of Newark, New Jersey and bearing a latest revision date of December 17, 2024. A Geotechnical Engineering Report prepared by Stephen F. Patt, PE and Jeffrey C. Yates, PE with ECS Mid-Atlantic, LLC of Moorestown, New Jersey dated December 10, 2024. Addendum No. 1 — Results of Test Pit Excavation and Infiltration Testing prepared by Jeffrey C. Yates, PE and Stephen F. Patt, PE dated January 29, 2025. A completed Application Form dated July 16, 2025. A Disclosure of all entities and individuals having a ten percent (10%) or greater interest in Mavis Tire Supply LLC. A ccompleted Application for Tree Removal & Replacement Permit dated August 11,
A Disclosure of all entities and individuals having a ten percent (10%) or greater interest in Mavis Tire Supply LLC. A ccompleted Application for Tree Removal & Replacement Permit dated August 11, 2025. Acompleted Site Plan/Subdivision Checklist. A completed Sustainability Checklist Form. A July 9, 2025 Buffer Report from the Office of the Assessor which lists the properties within 200 ft of Block 105, Lot 64.01. H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\t 15 WRZ0105 V01 - Mavis Tire Supply, LLC\26-03-25 Review #2 docx
File revisions (1)
- Sep 29, 2026
f0b4976636a5696,580 bytes