Supporting Documentation · May 28, 2026
Filing Letter resubmission 022426rcd 2 26 2026
d8b7d293a060636ba16e70fe511a7ca808f2c55ab22fc073e04cf36d3bc4e26aIndexed text · page 1
Show all pagesC H I E S A S H A H I N I A N & G I A N T O M A S I P C 105 Eisenhower Parkway, Roseland, NJ 07068 csglaw.com LISA A. JOHN-BASTA Member ljohn-basta@csglaw.com O 973.530.2083 F 973.530.2283 N E W J E R S E Y N E W Y O R K February 24, 2026 VIA FEDERAL EXPRESS Ms. Diana Chandler-Zimmerman Zoning Board Secretary Township of West Orange 66 Main Street West Orange, New Jersey 07052 Re: Mavis Tire Supply, LLC 460 Prospect Avenue – Block 105, Lot 64.01 Application for Preliminary and Final Site Plan Approval with Use Variance and Design Waiver Relief (Resubmission) Dear Ms. Chandler-Zimmerman: This office represents Mavis Tire Supply, LLC (the “Applicant”), which filed an application for preliminary and final site plan approval, use variance, bulk variance, and design waiver relief related to property located at 460 Prospect Avenue and designated as Block 105, Lot 64.01 on the Tax Maps of the Township of West Orange (the “Property”) on August 21, 2025 (the “Initial Filing”). Subsequent to the Initial Filing, the Applicant attended a Site Plan Review Advisory Board Meeting (“SPRAB Meeting”) and received Engineering Review Letter #1 issued by CME Associates on September 9, 2025, and Planning Review Letter #1 issued by CME Associates on October 23, 2025 (collectively the “Review Letters”). In response to comments and recommendations received during the SPRAB Meeting as well as set forth within the Review Letters, please accept five (5) sets of the enclosed revised submission materials for filing with the Township of West Orange Zoning Board of Adjustment (the “Zoning Board” or the “Board”), which seeks to address the comments received to date to the greatest extent possible. Dynamic Engineering Response Letter to the Review Letters dated February 19, 2026. Preliminary and Final Site Plan, prepared by Dynamic Engineering Consultants, PC, consisting of nineteen (19) sheets, revised through February 16, 2026. Architectural Plans, prepared by Larson Design Group, Inc., consisting of five (5) sheets, revised through February 12, 2026.
File revisions (1)
- Sep 29, 2026
d8b7d293a060156,516 bytes