Supporting Documentation · May 28, 2026
Filing Letter resubmission 022426rcd 2 26 2026
d8b7d293a060636ba16e70fe511a7ca808f2c55ab22fc073e04cf36d3bc4e26aIndexed text · page 2
Show all pagesMs. Diana Chandler-Zimmerman February 24, 2026 Page 2 List of Variances and Waivers, prepared by Dynamic Engineering Consultants, PC, dated February 2026. Traffic Impact Study, prepared by Dynamic Traffic, revised February 12, 2026. Stormwater Management, Water Quality and Groundwater Recharge Analysis, prepared by Dynamic Engineering, revised February 2026. Stormwater Management Operation and Maintenance Manual, prepared by Dynamic Engineering, revised February 2026. Completed Grading Plan Design Items. Tree Removal Report, prepared by Dynamic Engineering, dated February 2026. Consulting [Planning] Report, prepared by Cofone Consulting Group, dated February 17, 2026. Additionally enclosed please one (1) Application for Stormwater Permit submitted in response to Engineering Review Letter #1, comment C.1, which contains the following items: Original Executed Township of West Orange Application for Stormwater Permit. Preliminary and Final Site Plan, prepared by Dynamic Engineering Consultants, PC, consisting of nineteen (19) sheets, revised through February 16, 2026. Mavis Tire Supply LLC Check No. 45642 in the amount of $150.00 made payable to the Township of West Orange, which represents the appropriate permit fee. Lastly, we have enclosed a USB drive containing copies of all the documents referenced above. Should you have any questions or require any additional information related to this submission, please do not hesitate to contact me. Very truly yours /s/ Lisa A. John-Basta Lisa A. John-Basta Member LAJ/ Enclosures
File revisions (1)
- Sep 29, 2026
d8b7d293a060156,516 bytes