Supporting Documentation · May 28, 2026
Traffic Impact Study 021226 resubmissionrcd 2 26 2026
7a90898f5ecd279b745ee8ca97c767a8f7a155a66e5785b96f6447fdbee3c4dfIndexed text · page 55
Show all pages1956 24-04212 Build-AM 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR v/c Ratio 0.63 0.22 0.03 0.17 0.13 0.24 0.22 Control Delay (s/veh) 42.3 0.9 41.0 5.7 6.0 10.2 2.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 42.3 0.9 41.0 5.7 6.0 10.2 2.8 LOS D A D A A B A Approach Delay (s/veh) 25.2 41.0 5.9 7.6 Approach LOS C D A A Queue Length 50th (ft) 89 0 1 12 23 56 19 Queue Length 95th (ft) 173 0 11 57 78 146 72 Internal Link Dist (ft) 197 145 245 14 Turn Bay Length (ft) 100 Base Capacity (vph) 317 588 161 720 2527 2082 1272 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.58 0.22 0.02 0.16 0.13 0.24 0.22 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length:
0.58 0.22 0.02 0.16 0.13 0.24 0.22 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 83.6 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.63 Intersection Signal Delay (s/veh): 10.7 Intersection LOS: B Intersection Capacity Utilization 53.0% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 10: Prospect Avenue (CR 577) & Rooney Circle/Driveway DJR Synchro 12 Report 02/12/2026 Lanes, Volumes, Timings
File revisions (1)
- Sep 29, 2026
7a90898f5ecd6,686,365 bytes