Supporting Documentation · May 28, 2026
2026 05 Operations and Management Manual rcd 5 6 2026
Preserved file SHA-256
d849b44a21384da87618b5c37017133fe09afc6ca1e1c6dd542e59b5b7ca6affIndexed text · page 14
Show all pages1. REMOVAL OF DEBRIS AND SEDIMENT _ | | I 2. STRUCTURAL REPAIRS I l I 3, EMBANKMENTS AND SIDE SLOPES I l [ 4. DEWATERING I I I 5. BASIN MAINTENANCE [ l I (6. CONTROL OF MOSQUITOES: I T [ 7. EROSION REPAIR [ I I 8. FENCE REPAIR [ I I 19. SNOW AND ICE REMOVAL. I [ [ 10. SAND LAYER REPLACEMENT I [ [ U1, OTHER I I l [ETIC MAINTENANCE T, GRAFFITI REMOVAL [ I I 2. GRASS TRIMMING l I I 3. WEEDING I I I 4, OTHERS I I ] WORK ORDER PREPARED BY: WORK COMPLETED BY:
File revisions (1)
- Sep 29, 2026
d849b44a21383,872,892 bytes