Supporting Documentation · May 28, 2026
2026 05 05 Response Letter rcd 5 6 2026
0741d19ba1a6e83ef1167e9fb712fc8e7f252907cab2775f249cabf70cc6e020Indexed text · page 11
Show all pagesMavis Tire Supply, LLC May 5, 2026 Page 11 of 21 34. The 'Bioretention System Detail' on sheet 15 should be revised to provide specifications for the soil planting bed which complies with Chapter 9.7 of NJ BMP manual. Response: The site plan drawings have been revised to include specifications for the soil planting bed complying with Chapter 9.7 of the NJ BMP manual on the “Bioretention System Detail”. 35. The 'Bioretention System Detail' on sheet 15 should be revised to provide a note which states that "The soil bed material must be placed in lifts not to exceed 6 inches. Additional materials may be necessary to account for settling over time." Response: The site plan drawings have been revised to include the above referenced note on the “Bioretention System Detail”. 36. The 'Bioretention System Detail' on sheet 15 should be revised to include a note which states that "The minimum density of vegetation within the system is 85%." Response: The site plan drawings have been revised to include the above referenced note on the “Bioretention System Detail”. 37. The 'Underground Basin Outlet Control Structure' Detail on sheet 16 should be revised to show the proposed height of the 4' weir and the vertical distance from the top of slab (elev. 617.75) to the bottom of the 8" reinforced concrete lid. Response: The site plan drawings have been revised to show the proposed height of the 4’ weir as well as the vertical distance from the top of the slab to the bottom of the 8” reinforced concrete lid on the “Underground Basin Outlet Control Structure Detail”. 38. The 'Underground Basin Outlet Control Structure' Detail on sheet 16 shows that the invert of the 48" pipe will be at elevation 617.75 whereas the '48" HDPE Schematic Underground Basin Detail' on the same sheet shows the bottom of basin elevation (6" minimum below the 48" pipe to also be at 617.75. This discrepancy must be resolved. Response: The site plan drawings have been revised to eliminate the elevation discrepancies on the “Underground Basin Outlet Control Structure Detail” and the “48” HDPE Schematic Underground Basin Detail”. D. LANDSCAPING COMMENTS 1. Due to soil volume being a limiting factor for a tree, provide one (1) CCR (Redbud) in lieu of the middle QC (Scarlet Oak) within a grouping of 3 QC. Also, provide an oak in the white oak family due to bacterial leaf scorch (BLS). To maintain the same
ee, provide one (1) CCR (Redbud) in lieu of the middle QC (Scarlet Oak) within a grouping of 3 QC. Also, provide an oak in the white oak family due to bacterial leaf scorch (BLS). To maintain the same quantity of shade trees, move one (1) oak to the northeast corner of the site. Response: The site plan drawings have been revised to replace 1 QC (Scarlet Oak) with 1 CCR (Redbud) within a grouping of 3 QC.
File revisions (1)
- Sep 29, 2026
0741d19ba1a6475,440 bytes