Supporting Documentation · May 28, 2026
2026 05 05 Response Letter rcd 5 6 2026
0741d19ba1a6e83ef1167e9fb712fc8e7f252907cab2775f249cabf70cc6e020Indexed text · page 2
Show all pagesMavis Tire Supply, LLC May 5, 2026 Page 2 of 21 Engineer Review #2, prepared by John J. Hess, PE, PP, of CME Associates, dated March 25, 2026 B. DESIGN COMMENTS 1. Based on our review, we find that the following items from the Township's Site Plan/Subdivision Checklist must be addressed: a) Item #14 - Affidavit of ownership. Response: A copy of the Affidavit of Ownership was included in the August 20, 2025 submission. An additional copy will be recirculated to the Zoning Board under separate cover by the applicant’s attorney. 2. The Applicant has requested the following waivers in support of this application: a) From the requirement to provide a minimum illumination level of 2.0 FC for the parking areas. b) From the requirement to provide road and paving cross-sections and profiles (Checklist Item #41). c) From the requirement to provide proposed street names (Checklist Item #42). d) The Applicant proposes to comply with the West Orange COAH Ordinance as a condition of approval. Response: Informational; no response required. 3. The Applicant should address the Board regarding the proposed hours of operation of the Mavis Tire Center and the hours of operation of the proposed site lighting. We recommend that light levels be dimmed/turned off one hour after closing to reduce light pollution. Response: Testimony regarding proposed hours of operation of the Mavis Tire Center, and the hours of operation of the proposed site lighting, will be provided during the Zoning Board hearing. The site plan drawings have been revised to add a note stating proposed light fixtures are to be installed with timers to ensure lights are turned off after hours of operation. 4. The Applicant should address the Board regarding the proposed frequency and anticipated hours for deliveries to the site. Response: Testimony regarding proposed frequency and anticipated hours for deliveries to the site will be provided during the Zoning Board hearing. 5. The Applicant should address the Board regarding the anticipated frequency and anticipated hours for removal of the waste oil at the site. In addition, the plans should be revised to show the location of the proposed waste oil tank. Response: Testimony regarding anticipated frequency and anticipated hours for removal of the waste oil at the site will be provided at the Zoning Board hearing. The site plan drawings have been revised to note
Testimony regarding anticipated frequency and anticipated hours for removal of the waste oil at the site will be provided at the Zoning Board hearing. The site plan drawings have been revised to note that the proposed waste oil tank will be located within the proposed building footprint.
File revisions (1)
- Sep 29, 2026
0741d19ba1a6475,440 bytes