Show all pagesMavis Tire Supply, LLC May 5, 2026 Page 4 of 21 will coordinate as needed with the Township and neighboring property on this matter. 10. It shows on sheet 5 that a 10'x10' masonry trash enclosure is proposed at the southeast corner of the building. The Applicant should provide testimony to the Board to demonstrate that the proposed trash enclosure will have adequate capacity to accommodate the trash and recyclables that will be generated at the site. Response: Testimony regarding the trash enclosure capacity will be provided during the Zoning Board hearing. 11. It shows on sheet 5 that the proposed trash enclosure will be located close to the rear property line. We note that the property in question abuts an existing residential neighborhood. The Applicant should address the Board regarding the anticipated frequency and hours of pickup. Our office is concerned with the potential noise impacts on the adjoining residential properties. Response: Testimony regarding trash pickup hours and frequency will be provided during the Zoning Board hearing. 12. Sheet 5 should be revised to show the locations of the proposed detectable warning surfaces. Response: Sheet 5 has been revised to show locations of proposed detectable warning surfaces. 13. It shows on sheet 6 that there is an existing low point on the common property line with lot 2 just north of the existing 'A' inlet. In order to address this issue, it is our recommendation that the elevation of the grate on the existing 'A' inlet be lowered to provide positive drainage to the inlet. Response: A yard inlet with a 12” Class V RCP pipe has been added to the north of the existing inlet at a lower grate elevation to reduce the potential for standing water at this location. 14. It shows on sheet 7 that the Applicant proposes to install a new 6" DIP sewer lateral which will connect to an existing 6" cast iron sewer line. However, condition of the existing 6" cast iron sewer line is not known. As discussed at the November 18, 2025 SPRAB meeting, the existing cast iron sewer lateral should be televised to the point of connection to the existing sewer main to demonstrate that it is in good condition. In addition, sheet 7 should be revised to show the existing sewer main that the existing 6" cast iron sewer line connects to. Response: The Applicant is in the process of coordinating having the existing cast iron sewer
7 should be revised to show the existing sewer main that the existing 6" cast iron sewer line connects to. Response: The Applicant is in the process of coordinating having the existing cast iron sewer lateral televised to the point of connection to the existing sewer main, and a summary of findings will be provided as a condition of approval. 15. The plans should be revised to include the following details: a) Detectable Warning Surface b) Trash Rack c) 4' Wide Riprap Swale
File revisions (1)
- Sep 29, 2026
0741d19ba1a6475,440 bytes