ZB-25-10 Conditions Relief Page 2 of 2 Seton Hall Prep West Orange, New Jersey Based on the varying field dimensions, the applicable light levels are read and averaged over a different area resulting in differing light level reading as indicated; 6. Pole height of 90’: Site Sections illustrating the positions and relationships of the poles, the topography and the adjacent houses has been included in the drawing set. Further testimony will be provided. 7. Clarification on hours of operation of lights: Testimony will be provided to further clarify proposed hours and conditions of use; 8. SESC Approvals – The site is located within the jurisdictional area of the HEPSCD, but the proposed project does not exceed the permitted maximum requirements requiring SESC permitting. However, we are making application to HEPSCD to amend the previously certified SESC plans; 9. Key Map on Sheet TS-03 references lots to be consolidated. The phrase has been struck from the amended plan. All lots were previously consolidated; 10. Isolux Diagram for individual Sports Lighting Array differs from those depicted on the Site Lighting Plans – The Sports Array Isolux Diagram was included to illustrate the general throw and distribution from a single Sports Light pole. The lighting levels illustrated on the Site Lighting Plans include contribution from multiple sources, and are measured and averaged based on varying field sizes specific to each sport; 11. Sports Lighting Footings: These foundations are part of the purchase of the Sports Lighting package which is subject to required municipal approvals. Signed and Sealed engineered Shop Drawings would be provided with the Building Permit application; 12. Pole and Fixture colors have been added to the drawing set; 13. Pathway Lighting foundation detail has been changed to require a minimum strength of concrete to meet or exceed 4,500 psi; 14. Catalog Cuts : a. Pathway Pole Cuts have been added to Sheet ST-3.2; b. Sports Lighting moved to a new Sheet A-3.3 including manufacturer’s Catalog Cuts; 15. Isolux Patterns – Isolux Diagrams have been added to Sheet A-3.2 for the Pathway lighting. We believe the responses to be complete and satisfactory to the Reviewer in support of this application. Should there be any additional questions or information required at this time we make ourselves available. Please feel free to contact our

Page 2

satisfactory to the Reviewer in support of this application. Should there be any additional questions or information required at this time we make ourselves available. Please feel free to contact our office. Sincerely, HEINTZ & FIORE, AIA Architects, LLC Donald R. Fiore, AIA Cc: Seton Hall Prep – et.al. Att: Amended Plan Set and Application Checklist

File revisions (1)