Supporting Documentation · May 28, 2026
26 05 19 Engineering Review 3
fdb62d1179ecc13a1dffd7f209a6903dc082ed6c9317a7cade67c80129ab71a5Indexed text · page 6
Show all pages\RTHEO?T BUILT ON LEGACY, DRIVEN BY PURPOSE D. LANDSCAPING COMMENTS 1. As recommended in our March 25, 2026 review letter, an oak tree should be provided at the northeast corner of the site in maintain the same quantity of street trees. In addition, the oaks should be in the white oak family due to bacterial leaf scorch (BLS). E. LIGHTING COMMENTS 1. The plans have been revised to propose timers for the light fixtures. The proposed hours of operation for the lights should be indicated on the plans. Our office recommends that light levels be reduced or turned off 1 hour after the close of work to reduce light pollution. The Applicant is hereby advised that any revised plans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made to the plans as these may not be readily apparent. h:\legacy\nowell-fs1\sec\west orange\zoning board\115.wrz0105.v01 - mavis tire supply, Ilc\26-05-19 review #3.docx Page 6 of 6
File revisions (1)
- Sep 29, 2026
fdb62d1179ec443,034 bytes