Page 156

iers, roof drains, and the underground pipes that carry roof water runoff Location of roof lead: levations labeled for each pipe. shown with material types, pipe sizes, and invert el Stormwater Management System labeled with dimensions as well as invert elevations of drain pipes connected to the system. cluding dimensions and Construction details for the Stormwater Management System int pipes (RCP, PVP) materials to be used (such as concrete tank, cast iron manhole cover, gravel, etc. ‘Stormwater capacity calculations in accordance with § 25-29.3C and § 25-29.9 Details of all stormwater management facility design, during and after construction. Existing and proposed utility ‘connections to the existing and proposed structures. ‘Sump pump drain pipe location and discharge point. Footing drain location and discharge point. Stormwater Management System overftow, as well as cleanout Plans must accurately show existing natural ‘and manmade features (lakes, ponds, etc.) on the site as well, within 25 feet of all property lines, including location of any easements. ‘Alltrees larger than 10-inches in diameter, measured at ‘4-feet above ground tevel are shown and labeled with diameter and species. PROJECT THAT DOES NOT SHOW TREES WILL BE REJECTED. *Please refer to the Forester’s Office fora permit application and procedures (973-325-4015). location of trees greater than 10 inches in diameter, | measured at 4 feet above ground level, on the site as well as within 25 feet of all property | tines, as well as all trees planned for removal. A separate landscaping/tree planting plan is required by the Township Forester. * Please refer to the Forester’s Office for requirements Plans must accurately show the NA (973-325-4015). Plans must clearly identify all wetlands, riparian lands, steep stopes, flood plains and any associated buffers or transition areas. Location of floodplains, wettands, and water bodies if application is directly within 300 feet of same. If NIDEP and/or HEPSCD permits are required, a copy of the approval by NIDEP and/or HEPSCD shoutd be sent when availabie to Engineering for inclusion in the application. t control measures such as filter fence, Plans must clearly show soil erosion and sediment construction vehicle tracking pads, storm sewer inlet protection, tree protection details, etc., including construction details for all

Page 156

filter fence, Plans must clearly show soil erosion and sediment construction vehicle tracking pads, storm sewer inlet protection, tree protection details, etc., including construction details for all proposed measures. Proposed improvements or work to be completed shall be highlighted, easily identifiable and accurately shown to scale. Plan scale shall not be less than 1 inch = 30 feet. Drainage provisions for stormwater runoff from impervious surfaces shalt comply with | provisions stated in 8 25-29.3, $29.7, &§ 29.9. Construction details for drainage structures must include dimensions that are legible. Calculations shall be included on the plan. ‘Submit 2 signed and sealed copies of grading plan Maintenance manual for stormwater facilities in accordance with NJDEP guidelines and BMP manual to be included. SofS Dept. of Engineering: June 2025

File revisions (1)