Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 24, 2026

Cvr Ltr and Application Packet W Exhibits Orange Prospect LLC April 2026

Preserved file SHA-256a90070d973f9686740eec27d9f9a3d83bdd8ed696d70d9e579ba15b29ee92cd5

Indexed text · page 19

Show all pages
Page 19

SUSTAINABILITY CHECKLIST FORM Amended Site Plan Application ~ 111 Prospect Avenue Block 154, Lot 17.01 | ORANGE PROSPECT LLC APPLICANT— PRINT OR TYPE—ALL SECTIONS TO BE COMPLETED: TOWNSHIP OK (Date) SUSTAINABLE BUILDING AND DESIGN solur gain in summer and insulate in winter (ii) Use of roofing materials that are no darker than a light gray or demonstrate how alternate roofing materials reduce the urban heat island effect STANDARDS Name of LEED Accredited Professional working on project: N/A j List of Energy Star and WalerSense appliances, fixtures and NWA , consiniction techniques: ‘ List of green and recycled building materials ih new construction, renovation, and maintenance: N/A : t Waste Management Plan for recycling and/or reuse of 60 , percent of all construction and demolition of waste i generated in projects larger than $25,000: NIA . | Use of any water ellicient landscaping: N/A Use oF any on-site renewable energy systems such os: @ Solar ( Wind NIA : ii) Geothermal i Details of rooting materials designed lo reduce the urban Y heat island effect such as: w Construction of roof top gardens to reduce NIA ! Details of any sustainable stormwater systems employed such as: (i) ——_Bioswales/ raingardens (i) Permeable surfaces (iii) Grey woter systems (iv) Retention and detention facilities See Stormwater Maintenance Manual submitted herewith. (¥)___ Continuous trenching A list of native and well adapted species used in landscaping to eliminate the need for fertilization and pesticides: See Tree Replacement plan as part of amended civit site plan set submitted herewith. Note: Please indicate for each of the sustainable building/d reason(s) why it is not being incorporated in the project. As of sprit 2, 2015 jesign items listed, the extent to which the measure is being incorporated in the project or, alternatively, indicate the PAGE 7 -(SUST)

File revisions (1)