Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 24, 2026

Cvr Ltr and Application Packet W Exhibits Orange Prospect LLC April 2026

Preserved file SHA-256a90070d973f9686740eec27d9f9a3d83bdd8ed696d70d9e579ba15b29ee92cd5

Indexed text · page 29

Show all pages
Page 29

10. 11 12; 14. 15; 16. The current owners purchased the facility and seek to update the exterior to include a Porte-Cochere so that patrons can pull up to the front entrance and be protected from inclement weather. The project will include updating the exterior with removing part of the green house fagade and installing new glass and doors to exit to a fountain area. . The project also includes a reconfiguration of the exit driveway to make a safer exit by regrading the driveway so that exiting vehicles are on a more level plane and which allows for safer exiting movement. There are three parking areas, A, B & C with Lot B being the “front parking lot” that will have 6 ADA compliant parking spaces and 6 total EV parking spaces (2 of which are ADA and EV combined). . The placement of the ADA and EV spaces in the front lot (Lot B) was appropriate as this is the lot that will have the most use and provides those requiring ADA parking a direct route to the front entrance. The Applicant proposes to increase the available parking to a total number of parking space of 471 (including EV credits). A tree replacement plan was submitted to the Board which will be reviewed for approval by the Township Forester (as per West Orange Tree Ordinance.) Applicant will create a community garden behind and adjacent to the carriage house which currently has a green house. The garden will service the restaurant and banquet facility with vegetables and herbs grown on site and will also be available to certain community groups to use and learn from on a first come first served, annual application

File revisions (1)