Supporting Documentation · Jun 24, 2026
Cvr Ltr and Application Packet W Exhibits Orange Prospect LLC April 2026
a90070d973f9686740eec27d9f9a3d83bdd8ed696d70d9e579ba15b29ee92cd5Indexed text · page 82
Show all pagesvariance to increase the height of the building by 4 feet 4 inches and for the various 9 “C” variances above mentioned and to grant preliminary and final site plan approval and to waive a new environmental impact statement, a new drainage report and a new traffic report was made by Zal Velez and seconded by Anthony Vecchio and voted upon as follows: AYES NAYS ABSTENTIONS Abeles 0 0 Beuchler Gunning Rosenberg Sullivan Velez Vecchio NOW, THEREFORE, BE IT RESOLVED, that the Zoning Board of Adjustment of the Township of West Orange, based upon the Findings of Fact and Conclusions aforesaid, and upon the laws established in the State of New Jersey, hereby grants Bow & Arrow Manor, Inc., the “D” variance requested for the three story hotel building to be 39 feet 4 inches ; and does grant the following “C” variances: Maximum lot coverage of 57.4% instead of 40% as required; steep slopes maximum density of 97 units instead of 86.2 units as permitted and 59.1% maximum lot coverage instead of 34.5 % as permitted; restaurant set back to residential district of 55 feet on the side instead of 125 feet required; side yard set back contiguous to residential district of 55 feet instead of 75 feet; buffer strip in all non residential districts of 28 feet on the side and 65.05 feet in the rear instead of 75 feet in addition to the required set back; parking in the front which is not allowed; driveway distance to residential area of 23 feet instead of 50 feet as required and a
File revisions (1)
- Sep 29, 2026
a90070d973f911,581,849 bytes