Supporting Documentation · Jun 24, 2026
Cvr Ltr and Application Packet W Exhibits Orange Prospect LLC April 2026
a90070d973f9686740eec27d9f9a3d83bdd8ed696d70d9e579ba15b29ee92cd5Indexed text · page 87
Show all pagesthe Township Engineer for approval. 3. N.J.DEP Rainfall Intensity Curve should be used to calculate runoff values and submitted to the Township Engineer for approval. 4. The final grading and drainage swale along the rear of the property shall be subject to the approval of the Municipal Engineer. 5. The swale along the rear of this property should be inspected to determine if improvements are needed after Hurricane Floyd and report made to the Township Engineer and to meet their satisfaction. 6. Accessibility to the dumpster relocated to the western portion of Lot 15.03 shall be such as not to interfere with the adjoining residential homes. 7. A report shall be submitted to the Engineering Department concerning the light fixtures and any modifications thereof so that the Engineering Department shall approve the same. 8. The configuration of the hotel over flow parking lot leaves a parking island that can accommodate considerable landscaping. The landscaping proposed is insufficient and a new plan shail be submitted which shall include sodding and an increase of the landscaping to the satisfaction of the Township Planner. 9. Any trees that were inadvertently and erroneously removed in the area of the proposed location of the hotel shall be restored by Applicant by the planting of appropriate trees to the satisfaction of the Township Planner and Township Forester and for which a tree permit shall be obtained. 10. A representative of the Applicant will meet with any Deerfield Drive resident 13
File revisions (1)
- Sep 29, 2026
a90070d973f911,581,849 bytes